My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HARRIS & ASSOCIATES - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2022
>
HARRIS & ASSOCIATES - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:09:13 AM
Creation date
10/22/2015 2:37:07 PM
Metadata
Fields
Template:
Contracts
Company Name
HARRIS & ASSOCIATES
Contract #
A-2015-166
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/5/2017
Insurance Exp Date
8/1/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tasks. If requested by the City, the Consultant shall provide a Work Plan which includes a <br />detailed schedule of the assigned project prior to the issuance of Notice to Proceed of that <br />particular project and/or Task Order. Specific Task Orders with Notices to Proceed ("NTPs") <br />will be provided for project(s) at the discretion of the City. Work required per Task Order shall <br />comply with the Scope of Services and additional provisions in each Task Order and this <br />agreement. The Consultant shall also provide all field survey work required as appropriate and <br />shall have the necessary experience and required civil, traffic, electrical, structural, geotechnical, <br />surveying, landscape architect and architectural licenses for those in responsible -charge of the <br />work being completed. <br />The Consultant's services for PS&E engineering project preparation shall include, but not be <br />limited to, the following: <br />Research existing records of utility companies and agencies and coordinate the proposed <br />improvements with existing field conditions. <br />2. Provide all field survey and topographic work necessary to complete the design effort. <br />Design level survey and base mapping of the project site shall be prepared in US Customary <br />English units by a California licensed. Land Surveyor in accordance with the City guidelines <br />and in Microstation V'8i Computer Aided Design and Drafting (CADD) format. The <br />horizontal datum shall be NAD 83 and the vertical datum shall be NAVD 88. All survey <br />field notes shall be on forms provided by the City, shall be neatly completed in pencil, and <br />shall become property of the City upon completion of the project. Informal field <br />investigations including marking of removal areas may be required for some of the sidewalk, <br />curb and gutter, and pavement replacement projects. <br />Complete the design of projects including plans, specifications, and engineer's construction <br />cost estimate. The Consultant shall contact manufacturers and/or contractors to verify the <br />engineer's estimate prior to submitting to the City. Specifications shall be prepared in <br />Microsoft Word and an electronic copy of the final version shall be furnished to the City. <br />The City will provide the specification boiler plate to the Consultant. <br />4. If requested, all preliminary and bid sets of plans shall be plotted on bond or velum using the <br />Microstation V8i CADD program. All drawings shall be completed per the City of Santa <br />Ana CADD Standards. For interim submittals, the City may opt to receive only PDF <br />versions of the plans for reviewing purposes. if so, the Consultant team will provided plans <br />and/or specifications accordingly. <br />5. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be <br />signed and stamped by the Consultant's licensed professional engineer responsible/in-charge <br />of the project. These signed originals shall then become the property of the City. <br />6. If a part of the on-call project scope, the Consultant. shall provide support services during the <br />bidding and construction phases of the project on an as needed basis, including, but not <br />limited to: <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.