Laserfiche WebLink
please note that scope and fee are negotiable. <br />Reimbuisables included for budgetary putposes only. <br />Grayed out areas are not included in the total cost. <br />Sub -Total Design Phase (less optional items) $ 82,999 8 1,100 <br />Sub -Total Construction Cost (ftems 19-21) $ 11,129 S 650 <br />Is <br />I Pre -Design Project Start-up Meeting <br />4 <br />4 <br />S <br />1,280 <br />S <br />75 <br />2 To o to hicSurve <br />2 <br />7 <br />$ 00 <br />2,8 <br />$ <br />3,130 <br />7 <br />W <br />wg4 <br />5 <br />V W Zobb <br />3 Geotechnical Investigation <br />2 <br />$ <br />6,800 <br />7,130 <br />4 Design Development Plan <br />4 <br />4 <br />35 <br />$ <br />&910 <br />$ <br />50 <br />CONSTRUCTION DOCUMENT PHASE <br />5 Project Meetings <br />10.5- <br />3-5 <br />3.5 <br />$ <br />2.667 <br />150 <br />6 Site Utility Plan <br />2 <br />6 <br />16 <br />$ <br />3.100 <br />50 <br />7 Horizontal Control Plans <br />2 <br />4 <br />14 <br />$ <br />2,560 <br />S <br />50 <br />8 Preliminary H rology, Hydraulics Report, Grading and Drainarle Plans <br />2 <br />12 <br />48 <br />$ <br />7,710 <br />$ <br />50 <br />I EW±!�ZQ WAR %mimMon" <br />$ <br />6200 <br />$ <br />5 <br />'0 <br />_AW�, <br />10 Erosion Control Plan <br />1 <br />2 <br />10 <br />$ <br />1,625 <br />$ <br />so <br />11 Site Amenities Plan <br />16 <br />8 <br />35 <br />$ <br />7,110 <br />$ <br />50 <br />12 Planting Plans <br />6 <br />30 <br />$ <br />3,930 <br />$ <br />50 <br />13 1 ciation Plans <br />2 . <br />6 <br />24 <br />$ <br />3,798 <br />$ <br />so <br />14 Electrical Plans <br />2 <br />3 <br />7.000, $ <br />7.624 <br />S <br />50 <br />15 Construction Details! Structural Engineering <br />4 <br />6 <br />24 <br />$ <br />3,792 <br />S <br />50, <br />16 Technical Specifications <br />8 <br />12 16 <br />4 <br />8 16 <br />$ <br />7,952 <br />$ <br />50 <br />17 Final Opinion of Probable Cost <br />5 <br />4 <br />8 <br />2 <br />12 <br />S <br />3,765 <br />S <br />25 <br />13 Plan Submittals, Approval Process, and Permitting <br />a <br />4 <br />16 <br />14 <br />16 <br />$ <br />6.916 <br />S <br />300 <br />BID ADVERTISEMENT, CONSTRUCTION ADMINISTRATION & RECORD DRAWINGS <br />19 Bid Advertisement <br />6 <br />4 3.25 <br />3 <br />4 <br />$ <br />2,781 <br />$ <br />50 <br />20 Construction Administration <br />8 <br />8 8 <br />4 <br />4 <br />$ <br />4,440 <br />S <br />100 <br />21 Record Drawings I As Built Plans <br />4 <br />8 <br />24 <br />3,908. <br />500 <br />1 <br />99_5 1 <br />52 1 75 <br />5 <br />1 150 <br />825 <br />-- <br />195 20 1 $ 2,800 <br />6,800 1 $ <br />7,0001 <br />1 <br />please note that scope and fee are negotiable. <br />Reimbuisables included for budgetary putposes only. <br />Grayed out areas are not included in the total cost. <br />Sub -Total Design Phase (less optional items) $ 82,999 8 1,100 <br />Sub -Total Construction Cost (ftems 19-21) $ 11,129 S 650 <br />