My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TUSTIN, CITY OF (TSIA - COMPLETE COPY-2012
Clerk
>
Contracts / Agreements
>
T
>
TUSTIN, CITY OF (TSIA - COMPLETE COPY-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2017 11:21:20 AM
Creation date
11/9/2015 12:07:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TSIA Board Meeting <br />August 30, 2001 <br />Page 4 <br />i <br />Fai TAM <br />Reconfiguration Project must be the first project to go forward because of the lowering <br />of Edinger Avenue and the reconstruction of the ramps. <br />Pat McGuigan asked if there will be a lot of takes of property on Edinger (within Santa <br />Ana). <br />George Alvarez answered that the Texaco station is a full take; three other properties <br />are partial takes. <br />Lisa Bist moved; Lou Bone seconded; motion carried unanimously. <br />2. Allocation of TSIA Funds for Right -of -Way Acquisition and Construction of <br />the Red Hill Avenue Widening Project at 1 -5 (Area "B ") — Tim Serlet <br />Recommendation: <br />1. Authorize an additional TSIA allocation in the amount of $115,000 in FY <br />2001/02 for the completion of the right -of -way acquisition phase; and <br />2. Authorize a TSIA allocation in the amount of $145,000 in FY 2001/02 for <br />the construction phase of the Red Hill Avenue Widening Project at 1 -5 <br />within TSIA Area B. <br />Mr. Serlet reported that the plan consists of widening Red Hill Avenue between El <br />Camino Real and Nisson Road in the City of Tustin, adding bike lanes on each side of <br />Red Hill, adding a dedicated right -turn lane for southbound Red Hill onto northbound 1 -5, <br />extending the left -turn pocket for northbound Red Hill to northbound 1 -5 along with <br />extending the northbound right -turn lane on Red Hill for southbound 1 -5. The total <br />project is $1.7 million. Additional TSIA funds are requested to cover a short -fall in right - <br />of -way acquisition of $115,000 and a construction short -fall of $145,000. The project <br />has approximately $850,000 in Measure "M" money; the City of Tustin has provided <br />$406,000 in CIP funds, and the remainder will be TSIA funds. <br />Pat McGuigan moved; Lou Bone seconded; motion carried unanimously. <br />3. Seventeenth Street/Tustin Avenue Intersection Improvement Project — <br />Joyce Amerson <br />Recommendation: <br />Authorize $2,382,230 of TSIA Area A furids for the improvement of the <br />intersection of Seventeenth /Tustin. <br />
The URL can be used to link to this page
Your browser does not support the video tag.