Laserfiche WebLink
5. What operating systems (including versions) are used during compilation? Is the software executed on any other <br />operating systems /version? <br />6. How many separate deliverable components (executables, share libraries, etc.) ae built? <br />7. What compilers /linkers /other tools (brand and version) are necessary to build the application? <br />8, What, if any, third -parry libraries are used to build the software? <br />9. How long does a complete build of the software take? How much of that time requires some form of human <br />interaction and how much is automated? <br />10. Do you have a formal build document describing the necessary steps for system configuration and compilation? <br />11. Do you have an internal QA process? Ipso, please give a brief description of the testing process. <br />12. Please list the appropriate technical person(s) Iron Mountain may contact regarding this set of escrow deposit <br />materials. <br />Please provide your contact injorination below: <br />Name: <br />Telephone: <br />Company: <br />Address: <br />City, State <br />Country: <br />E-mail; <br />Code <br />For additional information about Iron Mountain Technical Verification Services, please contact <br />Shane Ryan at 978. 667 -3601 ext.100 or by e -mail at mallto: stfanervun(ir:ironmountain. corn. <br />MA3- 100105 NA <br />IVW)V. irolon o untail .Coin <br />25B -142 <br />Page 16 of 16 <br />