My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PD SOFTWARE SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
11/17/2015
>
25B - AGMT - PD SOFTWARE SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2015 2:33:31 PM
Creation date
11/12/2015 1:58:24 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
25B
Date
11/17/2015
Destruction Year
2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Priority <br />- Resolution. Process <br />- Resolution Time <br />Priority 2 — <br />TriTech will provide a procedural or configuration <br />TriTech will work continuously (including after <br />Urgent Priority <br />workaround or a code correction that allows the <br />hours) to provide the Client with a solution that <br />Client to resume normal operations on the <br />allows the Client to resume normal operations on the <br />production system. <br />production system. <br />TriTech will use commercially reasonable efforts to <br />resolve the issue as soon as possible and not later <br />than 36 hours after notification. <br />Priority 3 - <br />TriTech will provide a procedural or configuration <br />TriTech will work to provide the Client with a <br />High Priority <br />workaround that allows the Client to resolve the <br />resolution which may include a workaround or code <br />problem. <br />correction within a timeframe that Cakes into <br />consideration the impact of the issue on the Client <br />and TriTech's User base. Priority 3 issues have <br />priority scheduling in a subsequent release. <br />Priority 4 — <br />If TriTech determines that a reported Medium <br />TriTech will work to provide the Client with a <br />Medium Priority <br />Priority error requires a code correction, such <br />resolution which may include a workaround or code <br />issues will be addressed in a subsequent release <br />correction in a future release ofthe software, Priority <br />when applicable. <br />4 issues have no guaranteed resolution time. <br />Priority 5— <br />Low Priority issues are logged by TriTech and <br />There is no guaranteed resolution time for Low <br />Low Priority <br />addressed at the company's discretion according to <br />Priority issues. <br />TriTech's roadmap planning process. <br />Additional Information: <br />State and Federal mandates relating to Justice queries and reporting change from time to thee, The following changes are <br />considered covered support items. <br />A. Modifications to installed Uniform Crime Reporting (UCR) Program or National Incident Based Reporting System <br />(NIBRS) facilities within the Inform RMS Licensed Software, as necessary, in order to accommodate Government <br />Mandated Changes dictated by State and Federal agencies having authority over these programs. <br />Santa Ana System Purchase and Support Agreement — Addendum E <br />Copyright © 2015 TriTech Software Systems <br />Unpublished: Rights reserved Linder the copyright laws of theUnitcd States <br />Page 11 of 24 <br />25B -167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.