Laserfiche WebLink
CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS FOR ZOO CARE AND QUARANTINE FACILITY <br />RFP NO. 15 -079 <br />SCOPE OF WORK <br />DESCRIPTION AND SCOPE OF WORK <br />The City of Santa Ana is seeking a qualified contractor to provide site improvements, furnish, and install <br />a new 12 x 40 foot modular building at the Santa Ana Zoo at Prentice Park as described herein. <br />Background <br />The Santa Ana Zoo at Prentice Park opened to the public in 1952, continual development and <br />improvements led to accreditation by the Assodiation of Zoos and Aquariums (AZA) in 1985. The <br />proposed Zoo Care and Quarantine Facility will provide a secure space for new animals to the zoo to <br />undergo preventative health screenings in keeping with current standards of the AZA and United States <br />Department of Agriculture. The new facility will provide a safer working space for the staff, and allow <br />for easier acquisition of animals, ultimately furthering the Zoo's mission "To instill a passion for the <br />natural world through education, recreation and conservation." <br />Scope of Work <br />A. IMPLEMENTATION <br />1. City staff shall have the right to modify, reduce, or delete the services as needed by City. <br />2. Successful proposer shall be responsible for manufacture, delivery, site work, off- <br />loading, assembly, placement and complete turnkey internal and external hook -up of <br />systems including providing site electrical, water, and sewer to proposed building. <br />3. Scope of work includes the entry decking, ramps, steps, and railings. <br />4. Successful proposer shall be responsible for plan submittal and approval to the City of <br />Santa Ana Building Department prior to start of construction. <br />5. Working hours are Monday through Friday 8:00am to 5:00pm. <br />6. Proposer shall review and incorporate the specifications in the detailed scope of work in <br />the presented plans. <br />a. A -1 Site Plan <br />b. A -2 Enlarged Site Plan /Floor Plan Keynotes /Deck Plan <br />c, A -2.1 Floor Plan Keynotes <br />d. A -3 Modular Building Elevations Details and Specifications <br />e. A -4 Specifications and Scope of Work Delineation <br />f. U -1 Site Utility Plan <br />7. Proposer supplied products shall be equal to or better than: <br />a. Lockers - Ideal Products Inc. — IDEAL 2000 Series Lockers <br />b. Flooring - Methyl Methacrylate Acrylic Flake Flooring by Oakridge Industries <br />c. Lightinq - Lithonia Lighting Wet Location Enclosed and Gasketed Lighting <br />Fixtures <br />d. Washer /Dryer - GE Model WCVH4800K Washer and GE DCVH480EK Dryer <br />B. PERFORMANCE SCHEDULE <br />The contract term shall be a period of four (4) months from award of bid. <br />City of2O�rw 41.5 -079 �� <br />