My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - VIDEO SECURITY SYS 2
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/01/2015
>
25D - AGMT - VIDEO SECURITY SYS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 3:56:29 PM
Creation date
11/30/2015 3:39:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25D
Date
12/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />Michael Dietsch <br />Enterprise Account Executive <br />Southern California <br />d. Repeater/ Link equipment shall be installed on Federal Courthouse Building (tinder <br />agreement with SAPD). <br />L Switches, Radios, Enclosures, Antennas, UPS <br />e. Head -end system enhancements: <br />I. Servers and Storage for 365 days of archived video for the new 33 cameras. <br />Siemens calculations are based on typical video bandwidth requirements and <br />includes 30 days of high resolution, multi -frame rate recording with 335 days of <br />single frame reduced resolution archiving. All storage calculations are provided <br />by Milestone. <br />ii, Network Switches <br />iii. Software and Licenses <br />iv. Programming <br />v. Training <br />vi. Commissioning <br />vii. Engineering Documentation <br />3. Siemens shall provide a qualified project manager for coordination of all installation activities. <br />The Siemens PM shall conduct weekly status updates with the client for coordination of all <br />installation efforts. <br />4. All equipment for installation is provided in detailed bill of materials. Equipment not specified <br />in this proposal or outside of described quote shall be provided at additional charge, including <br />storage and licenses. <br />5. Bill of Materials <br />1 <br />1 Tripplite <br />SU1500RTXL2UA <br />Cisco Catalyst 3850 -24P -S - Switch - 24 Ports - Managed - Desktop, <br />1 <br />Cisco <br />WS- C3850 -24P -S <br />Rack - Mountable <br />1 <br />Cisco <br />PWR- C1- 715WAC= <br />Cisco - Power Supply - Hot-Plug / Redundant -715 Watt <br />7 <br />Netonix <br />WS -6 -MINI <br />Cisco Industrial Ethernet 3000 Series - switch - 4 ports - managed - <br />2 <br />Cisco <br />Cisco IE- 3000 -4TC <br />DIN rail mountable <br />7 <br />Axis <br />0658 -001 <br />Cisco AC -DC Power Module for POE solution - power adapter - 65 <br />2 <br />Cisco <br />PWR- IE65W- PC -AC= <br />AXIS F1005 -E Sensor Unit, 3 m,w /F8201 Mt <br />17 <br />Axis <br />5504 -621 <br />Watt <br />Tripp Lite External Battery Pack - Battery enclosure ( rack- <br />1 <br />Tripplite <br />BP48V27 -2US <br />mountable) - 2U -19" <br />1 <br />1 Tripplite <br />SU1500RTXL2UA <br />Tripp Lite SmartOnLine- UPS - 1.2kW- 1500VA <br />1 <br />Tripplite <br />SNMPWEBCARD <br />Tripp Lite- remote management adapter <br />10 <br />Netonix <br />WS -8- 250 -AC <br />8 -Port Managed POE Switch, AC 250Watt <br />7 <br />Netonix <br />WS -6 -MINI <br />5 -Port Managed POE Switch, AC <br />25 <br />Axis <br />0694 -004 <br />AXIS Q6045 -E MI( II <br />7 <br />Axis <br />0658 -001 <br />AXIS F41 Main Unit <br />7 <br />Axis <br />0675 -001 <br />AXIS F1005 -E Sensor Unit, 3 m,w /F8201 Mt <br />17 <br />Axis <br />5504 -621 <br />AXIS T911361 Wall Mount <br />SOW Page 12 <br />25D -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.