My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - VIDEO SECURITY SYS 2
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/01/2015
>
25D - AGMT - VIDEO SECURITY SYS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 3:56:29 PM
Creation date
11/30/2015 3:39:40 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
25D
Date
12/1/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 21, 2015 <br />City of Santa Ana <br />Santa Ana, California <br />Project Name: Santa Ana Jail Surveillance System Convergence Program <br />• Replace ViconNet VMS with City standard Milestone XProtect <br />Michael Dietsch <br />Enterprise Account Executive <br />Southern California <br />• Upgrade existing analog cameras with IP High Definition Cameras <br />• Extend archiving capabilities to 365 days retention of video <br />• Create 3o day High Resolution/ High Frame Rate recorded video archive stream <br />• Integrate Jail Surveillance System with converged City of Santa Ana network and <br />surveillance platforms <br />Siemens to provide all equipment and services to the City of Santa Ana (CoSA), per this scope of <br />work document. It is the intent of this proposal to provide a turnkey installation solution for <br />the described systems: <br />a, Jail security /surveillance systems <br />b. Storage system expansion <br />c. Expanded network <br />d. New camera installation <br />e. Upgrade existing cameras <br />Siemens has utilized quantities and counts per drawings and specifications developed in <br />conjunction with the City of Santa Ana Police Department. The BASE SYSTEM can be <br />summarized as follows: <br />Siemens to replace existing analog cameras throughout the Santa Ana Jail Surveillance <br />System. Access System (used for manual verification and jail system controls) is not <br />included in this scope of work. The existing analog matrix switch will not be controlled <br />or interfaced with, unless specifically called out. <br />Siemens to install high definition cameras throughout, per the camera schedule and this <br />scope of work. Siemens will conduct a final engineering document prior to <br />commencement of work. Changes, additions and deletions will be detailed at that time <br />and a modification to the scope of work and agreement will be agreed by both parties, <br />as required. <br />o Passage hallway to County Jail will utilize existing cameras and be monitored in <br />the new system, in parallel. These cameras shall remain analog and will be <br />encoded for inclusion in digital system (-22 cameras) <br />SOW Page I 1 <br />25D -18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.