Laserfiche WebLink
SIEMENS <br />Michael Dietsch <br />Enterprise Account Executive <br />Southern California <br />152 <br />Siemon <br />MX407 <br />Cat 6A Shielded Workstation Green Jacks <br />26 <br />Siemon <br />9C6P4- E2- 07 -RXA <br />CAT6 System 6 Plenum 4 -Pair UTP Cable (CMP, CSA Type FT6), 1000 ft. <br />Reelex _ T <br />_ <br />6 <br />Siemon <br />HD6 -24 <br />24 -port flat HD 6 patch panel, T568A /B, 1 RMS <br />152 <br />Siemon <br />MX- SM2 -02 <br />Two Port Surface Mount Boxes - White 7-Max <br />152 <br />Siemon <br />MC6 -01 -07 <br />V CAT6 Mod Cord <br />152 <br />Slemon. <br />MC6 -07 -07 <br />T CAT6 Mod Cord <br />160 <br />Milestone <br />XPCODL <br />Milestone XProtect Corporate Device License <br />160 <br />Milestone <br />YXPCODL <br />Milestone XProtect Corporate Device SUP <br />8 <br />BlackBox <br />JHOOK- 64 -S -25 <br />Black Box 1 -HOOK 4" Standard, Size 64 - cable hook (pack of 25 <br />16 <br />BlackBox <br />JHOOK -32 -5 -100 <br />Black Box 1 -HOOK 2" Standard, Size 32 -cable hook (pack of 100 ) <br />24 <br />BlackBox <br />JHOOK -I2 -S -100 <br />Black Box J- 1-I001K 3/4" Standard, Size 12 - cable hook (pack of 100 ) <br />28 <br />Axis <br />5031 -511 <br />AXIS T8351 Microphone 3.5 mm <br />28 <br />Axis <br />5033.541 <br />AXIS T8353B Microphone Phantom Power <br />6, TECHNICAL APPROACH: <br />-Final Proposal <br />-City Council Approval <br />-PO Issuance <br />-Drawings/ Locations at Schematic Level (50 %) <br />-Schedule Development/ End -user coordination/ IT Coordination <br />-Design Drawings to 100% (incorporate any changes due to field conditions, <br />-Preliminary Order Placed for cabling, software, recording devices <br />Detailed Site Approach (schedule confirmed) <br />-Implementation Plan (Tool Plan, Safety Plan, 0A /QC Plan) <br />-Testing Plan <br />-Site Coordination/ Mobilization <br />-Install/ New System Standup <br />-Ste Testing <br />-As Built <br />-As-Built Submittals <br />- Testing and Close -Out Documentation <br />• Maintenance /warranty Turnover <br />SOW Page 14 <br />25D -21 <br />