My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2015-12-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/01/2015
>
FULL PACKET_2015-12-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2016 2:56:41 PM
Creation date
11/30/2015 4:00:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
12/1/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
784
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Construction Contract <br />PROJECT NO. 14-6799 & 14-6800 <br />TRAFFIC SIGNAL INSTALLATION ON NEWWOPE STREET AT CAMILLE STREET <br />AND MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET <br />This CONSTRUCTION CONTRACT is made and entered into this 19day of December, 2015, <br />by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal <br />corporation organized and existing immder the Constitution and laws of the State of California, <br />hereinafter referred to as "CITY" and PTM General Engineering Services Inc., <br />hereinafter referred to as "CONTRACTOR". <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows: <br />1. CONTRACTOR agrees to perforin all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Traffic Signal Installation on Newhope <br />Street at Camille Street & Traffic Signal Modification on Segerstrom Avenue at Bear Street, <br />hereinafter referred to as the "Work of Improvement", identified in and in accordance with <br />the Contract Documents prepared by the City's Public Works Agency and approved by the <br />City Council. <br />2. The complete Construction Contract consists of the "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which includc the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid. Proposal <br />• Bid Bond <br />• Contract Fonn <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Project Plans <br />• Required Contract Provisions Federal -Aid Constriction Contracts <br />(Form FFIWA 1273) <br />• Davis -Bacon Act and Wages <br />• Appendices <br />hi case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the <br />Work of Improvement the sum total amount not to exceed $373,973.00, as set forth and <br />identified in the BID PROPOSAL, which is attached hereto and incorporated herein as <br />Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump srun(s) <br />based on approximate quantities only, and the City does not expressly or by implication <br />Page 1 of 3 <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.