My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KPFF - 2015
Clerk
>
Contracts / Agreements
>
K
>
KPFF - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2020 11:18:39 AM
Creation date
12/8/2015 9:12:57 AM
Metadata
Fields
Template:
Contracts
Company Name
KPFF
Contract #
A-2015-175
Agency
PUBLIC WORKS
Council Approval Date
8/4/2015
Expiration Date
8/4/2019
Insurance Exp Date
10/10/2017
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. All original plan sheets, the title sheet of the specifications, calculations, and reports shall be signed <br />and stamped by the Consultant's licensed professional engineer responsible/in-charge of the project. <br />These signed originals shall then become the property of the City. <br />6. If a part of the on -call project scope, the Consultant shall provide support services during the bidding <br />and construction phases of the project on an as needed basis, including, but not limited to: <br />A. The Consultant shall respond to bidder inquiries during the bidding process, including <br />preparation of any addenda. Following award of the construction contract, the Consultant shall <br />attend the pre -construction meeting. <br />B. The Consultant shall review and approve all submittals and shop plan drawings required <br />supporting the construction contract. The Consultant shall complete shop drawings reviews <br />within two (2) weeks of receipt. Contract Change Order reviews shall be completed within two <br />(2) working days of receipt. <br />C. The Consultant shall respond to written Requests for Information (RFI) to provide clarification <br />or resolve discrepancies in the contract documents. Responses shall be completed within three <br />(3) working days. <br />D. The Consultant shall provide periodic field reviews and bring to the attention of the City of Santa <br />Ana any defects or deficiencies in the work by the construction contractor which the Consultant <br />may observe. The Consultant shall have no authority to issue instruction on behalf of the City of <br />Santa Ana, or to deputize another to do so. <br />7. If included in the on -call project scope, upon completion of construction, the Consultant shall <br />prepare as-builts and submit them to the City. The Consultant shall incorporate all changes to the <br />plans electronically with all necessary revision notations. Once plans have been updated, a signed <br />set of as -built mylars shall be submitted to the City with an electronic copy (in Microstation V8i <br />CADD and pdf formats) of the final as -built drawings via CD or e-mail. <br />8. If included in the on -call project scope, the Consultant shall monitor the project progress, maintain <br />project files, and control the quality of the work performed by in-house staff and/or sub -consultants. <br />Incomplete (not meeting targeted completion) or poor quality work will not be accepted. The <br />Consultant shall revise the documents within a revised schedule set by the City, which may require <br />overtime. No additional compensation necessary for the consultant to complete this work to the <br />satisfaction of the City shall be approved by the City for the required revisions. It is the <br />responsibility of the Consultant to produce a professional -level quality of work product. <br />9. If included in the on -call project scope, attend meetings with the City staff as required. <br />10. If included in the on -call project scope, the Consultant shall coordinate plan check, design topics, <br />permits and any other issues with the City, other Agencies, and all utility companies as required. At <br />the direction of the City, the Consultant shall be the liaison with affected agencies. <br />11. If included in the on -call project scope, the Consultant shall be responsible for reviewing and <br />approving addenda and clarifications to plans and specifications. <br />City of Santa Ana Scope of Work <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.