My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - CLIMATE ACTION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/15/2015
>
75B - PH - CLIMATE ACTION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 5:00:24 PM
Creation date
12/10/2015 4:36:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br />3 Climate Action Plan Measures <br />Transportation & Land Use <br />Type of Measure <br />Bike sharing stations make bicycles easily available at a <br />v °lUntary ......... <br />low -cost hourly rate. This strategy entails the development <br />Emissions Reduction <br />of bike sharing stations at several locations throughout the <br />in 2020 <br />City including the Santa Ana Regional Transportation Center <br />871 MTCO¢e <br />.......................... I .....................••••• <br />(SARTC), major bus stop locations, City Hall, and other <br />Emissions Reduction <br />locations. These easily accessible bicycles can extend the trips <br />in 2035 <br />possible through transit, or directly substitute for automobile <br />4,984 MTCOze <br />........................... ............................... <br />trips on their own. <br />Co-Benefits <br />Reduced energy cost - residents; <br />Bike sharing will require up -front costs to construct the <br />Improved air quality; improved <br />stations and purchase the bicycles, funding for on -going <br />health; improved public realm <br />° °• ° ° °• ° ° °. ° ° °. ° ° °° °° ° °. ... ... ... ° ° °. <br />operating costs, and staff time to oversee and implement <br />Cost to City <br />the program. Some portion of the costs could be borne <br />Medium to High <br />• °......••••• °° °...... ° °•••• °•° ° ° ° ° ° °° <br />by a private vendor who would be responsible for the <br />Private Cost <br />operation of the facilities, with both rental fees and potential <br />Low <br />••••••••••••••••••.•••••••• •••••••.••...•••••..•..•.•..•.• <br />advertising revenue offsetting costs. Based on a review of <br />Potential Funding Sources <br />implementations in Washington, DC and Minneapolis, the <br />Private implementation partner; <br />initial construction cost for six stations will be approximately <br />General Fund <br />°°°°. ° °• °. ... ... ° °. ° °. ... ° °. ... ... ... ° °... <br />$360,000. The City will also be required to allocate some staff <br />Ease of Implementation <br />time on an ongoing basis to oversee the bike sharing system. <br />Medium <br />75B -46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.