Laserfiche WebLink
44 <br />3 Climate Action Plan Measures <br />Community <br />Energy Measures <br />-wide <br />Wo <br />K <br />Fi <br />ii <br />;Type of Measure <br />This measure accounts for the impact of new private <br />:: <br />In °antivzad <br />................. . <br />installations of solar Photovoltaic (PV) systems in Santa Ana. <br />i Emissions Reduction <br />Rebates or incentive payments for installation of solar PV are <br />in 2020 <br />available as part of the California Solar Incentive program, <br />i 14,881 MTCOze <br />i ............•••........ .....• ......................... <br />which is administered by the California Energy Commission. <br />j i Emissions Reduction <br />For a limited time the City is offering solar incentives which <br />in 2036 <br />may include permit fee waiver, free plan check services, and <br />4,881 MTCOze <br />i """"' °" ° " °"' °""""" <br />ii <br />free building inspection for solar PV systems. <br />Go-Benefits <br />Reduced energy cost — residents <br />Solar PV systems can lower energy costs for residents and <br />i and businesses; improved air <br />businesses. In addition, having more PV systems connected <br />;quality; Improved health <br />................ ' "' °' °'°" °' °' ° ° °" ° °' °'° <br />to the grid leads to increased electric system reliability during <br />coat to City <br />i <br />peak demand periods and increased electric price stability. <br />IoW <br />.......................................................... <br />This measure also supports employment with opportunities for <br />Pri "at® coat <br />solar installers. <br />i Medium <br />...................... .. ................. I ........ I....... <br />i Potential Funding Sources <br />These and other utility incentive programs will be promoted <br />State <br />through the City's comprehensive CAP Outreach and Education <br />Ii ........................... ............................... <br />program, as described in Chapter 4. <br />j Ease of Implementation <br />i Easy <br />75B -52 <br />