My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - GENERAL PLAN UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/15/2015
>
25C - AGMT - GENERAL PLAN UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 5:41:35 PM
Creation date
12/10/2015 5:38:59 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
25C
Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 2, 2015 <br />Melanie McCann <br />City of Santa Ana <br />20 Civic Center Plaza, Ross Annex M -20 <br />Santa Ana, CA 92702 <br />AMENDMENT PROPOSAL NO.4 - CIRCULATION ELEMENT UPDATE <br />This letter proposal details IBI Group's request for an amendment under our contract with the City <br />of Santa Ana for the Circulation Element Update project. Work efforts associated with this request <br />involve additional work will be incurred by IBI Group and Placeworks at the request of the City of <br />Santa Ana. The work efforts detailed in this amendment request were not included in our original <br />scope of services for this contract. The tasks listed below correspond to the tasks assigned in the <br />original scope of services for this contract. The proposed budget for completing this work is <br />attached to this letter. <br />Task ? — Project Management and Meetings <br />Amendment No. 1 included an augment to this task to reflect the ongoing management of the <br />contract up to a 39 -month effort. The current work effort as of August 2015 stands at 47- months, <br />which exceeds the extension provided under Amendment No, 1. Additionally, the city desires for <br />IBI Group and Placeworks to coordinate with the city and consultant selected as part of the Santa <br />Ana Safe Mobility Plan. <br />Based on these two components, IBI Group has budgeted for attendance by IBI staff and <br />Placeworks staff at up to three meetings for the Santa Ana Safe Mobility Plan and two hours per <br />month for IBI Group senior staff (project manager or deputy project manager) for ongoing <br />coordination with the city for a duration of 12 months from August 2015. This coordination effort <br />would carry the contract through the Safe Mobility Plan preparation and preparation of the draft <br />Circulation Element and environmental impact report (EIR). <br />Task 2 — Data Collection <br />As part of the original contract, IBI Group completed a data collection effort focused on the <br />inventory of the existing street network and collection of traffic, bicycle, and pedestrian counts. As <br />part of this effort, traffic counts were collected in June 2012 at 32 intersections and along 18 <br />roadway segments that were approved by the City's Public Works Department. The count <br />locations were selected based on proposed street reclassifications identified by IBI Group and the <br />City of Santa Ana in 2012. <br />As part of the additional traffic analysis work completed by IBI Group under Amendment No. 1, <br />the City of Santa Ana conducted and provided traffic counts at 8 intersections and along 6 roadway <br />segments in 2014, above and beyond those counts previously identified and collected in 2012. <br />101 Group is a group of firms providing professional services <br />25C -6 <br />IBI Group <br />7`j, `( <br />18401 Von Karman Avenue -Suite 110 <br />11..LKJ1 <br />Irvine CA 92612 USA <br />CRpUP <br />tot 9498335688 <br />fax 9498335611 <br />September 2, 2015 <br />Melanie McCann <br />City of Santa Ana <br />20 Civic Center Plaza, Ross Annex M -20 <br />Santa Ana, CA 92702 <br />AMENDMENT PROPOSAL NO.4 - CIRCULATION ELEMENT UPDATE <br />This letter proposal details IBI Group's request for an amendment under our contract with the City <br />of Santa Ana for the Circulation Element Update project. Work efforts associated with this request <br />involve additional work will be incurred by IBI Group and Placeworks at the request of the City of <br />Santa Ana. The work efforts detailed in this amendment request were not included in our original <br />scope of services for this contract. The tasks listed below correspond to the tasks assigned in the <br />original scope of services for this contract. The proposed budget for completing this work is <br />attached to this letter. <br />Task ? — Project Management and Meetings <br />Amendment No. 1 included an augment to this task to reflect the ongoing management of the <br />contract up to a 39 -month effort. The current work effort as of August 2015 stands at 47- months, <br />which exceeds the extension provided under Amendment No, 1. Additionally, the city desires for <br />IBI Group and Placeworks to coordinate with the city and consultant selected as part of the Santa <br />Ana Safe Mobility Plan. <br />Based on these two components, IBI Group has budgeted for attendance by IBI staff and <br />Placeworks staff at up to three meetings for the Santa Ana Safe Mobility Plan and two hours per <br />month for IBI Group senior staff (project manager or deputy project manager) for ongoing <br />coordination with the city for a duration of 12 months from August 2015. This coordination effort <br />would carry the contract through the Safe Mobility Plan preparation and preparation of the draft <br />Circulation Element and environmental impact report (EIR). <br />Task 2 — Data Collection <br />As part of the original contract, IBI Group completed a data collection effort focused on the <br />inventory of the existing street network and collection of traffic, bicycle, and pedestrian counts. As <br />part of this effort, traffic counts were collected in June 2012 at 32 intersections and along 18 <br />roadway segments that were approved by the City's Public Works Department. The count <br />locations were selected based on proposed street reclassifications identified by IBI Group and the <br />City of Santa Ana in 2012. <br />As part of the additional traffic analysis work completed by IBI Group under Amendment No. 1, <br />the City of Santa Ana conducted and provided traffic counts at 8 intersections and along 6 roadway <br />segments in 2014, above and beyond those counts previously identified and collected in 2012. <br />101 Group is a group of firms providing professional services <br />25C -6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.