My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - TERM CONTRACT 17TH WATER MAIN IMP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/15/2015
>
23A - TERM CONTRACT 17TH WATER MAIN IMP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 10:46:17 AM
Creation date
12/11/2015 10:41:56 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number 11 -6416: Seventeenth Street Water Main Improvements Change Order Number 3 <br />To Paulus Enaineerina. Inc. Contractor <br />You are hereby directed to make the hemin changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE, THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BYTHE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle rime, <br />Change requested by PUBLIC WORKS AGENCY <br />REDUCED CONTRACT QUANTITIES <br />Bid <br />Item <br />ITEM <br />UNIT <br />ORIGINAL <br />CONTRACT <br />QUANTITY <br />DELETED <br />QUANTITIES <br />UNIT PRICE <br />TOTALAMOUNT <br />1 <br />8" Class 200 AWWA C900 P.V.C. Water Main <br />LF <br />1,050.00 <br />(545,50) <br />$140.00 <br />($76,370.00) <br />2 <br />12" Class 200, AMA C900 P.V.C. Water <br />Main <br />LF <br />4,.,00 <br />98500 <br />2,768.00 ( ) <br />$189 <br />($523,152.00) <br />3 <br />Construct 1" Water Service per City Std, Plan <br />1401 <br />EA <br />51.00 <br />(19.00) <br />$1,400.00 <br />($26,600.00) <br />4 <br />Construct 2" Water Service per City Std. Plan <br />1402 <br />EA <br />24,00 <br />(14.00) <br />$2,900.00 <br />($40,600.00) <br />5 <br />4" Service Connection Including 4 "RWGV <br />EA <br />2.00 <br />(2.00) <br />$3,600.00 <br />($7,200.00) <br />6 <br />4" Fire Line Connection Including 4" RWGV <br />EA <br />200 <br />(2.00) <br />$3,700,00 <br />($7,400,00) <br />7 <br />New Fire Hydrant Assembly, Including Gate <br />Valve and Lateral Pipe <br />EA <br />17.00 <br />(8,00) <br />$6,800.00 <br />($54,400.00) <br />8 <br />1" Air Vacuum and Release Valve <br />EA <br />4.00 <br />(2,00) <br />$4,200.00 <br />($8,400.00) <br />10 <br />8" Resilient Wedge Gate Valve <br />EA <br />12.00 <br />(6.00) <br />$3,100.00 <br />($18,600.00) <br />11 <br />12" Resilient Wedge Gate Valve <br />EA <br />11.00 <br />(4.00) <br />$3,600.00 <br />($14,400.00) <br />12 <br />Bore and Jack, Install Steel Casing and PVC <br />Carrier Pipe <br />EA <br />4.00 <br />(2.00) <br />$18,000.00 <br />($36,000.00) <br />13 <br />Traffic Loop Detector <br />EA <br />45,00 <br />(3.00) <br />$275.00 <br />($825,00) <br />14 <br />Striping, and Pavement Markings <br />LS <br />1.00 <br />(0.50) <br />$9,200.00 <br />84( ,600.001 <br />CONTRACT CREDIT <$818,547.00> <br />Page 1 of 2 <br />Exhibit 3 <br />23A -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.