My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - PAVEMENT MNGT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
12/15/2015
>
25E - AGMT - PAVEMENT MNGT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 10:46:52 AM
Creation date
12/11/2015 10:42:07 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
12/15/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGREEMENT NO. C~5^Q02 <br />EXHIBIT <br />ARTERIAL PAVEMENT MANAGEMENT PROGRAM <br />FI��AL�'����JE��TF�EP(���TF4���0l <br />M Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following� 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) ard after photographs of the project site and the address or iocation of the site under <br />the Location and Scope uf work section. <br />Location and ScoDe of Work <br />Verification of Match <br />(Actual Expenditures) <br />Project Schedule <br />am 4 <br />Draft Environmental Document <br />Final Environmental Document <br />gg M5 <br />VIEW M <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />Project Schedule <br />������� <br />Page � �� <br />. <br />� U � o <br />am 4 <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right-of-Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />������� <br />Page � �� <br />. <br />� U � o <br />
The URL can be used to link to this page
Your browser does not support the video tag.