Laserfiche WebLink
f..,..._.,m._ _ Appendix <br />ATTACHMENTJ <br />._ SCOPE OF WORT <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />ENGINEEMNO, TWITNICAL AND ADMINISTRATIVIC SUPPORTSERVICES <br />RFP NO.: 15.045 <br />Introdnc02n. and Backmand <br />The City of Santa Ana is located in the County Of Orange in Southern California, The) City encompasses <br />27.5 square miles and apopulation of over 325,000 people. <br />The City of Santa Ana Public Works Agency is soliciting proposals for staff services firom consulting <br />firms to assist in the Design, Construction Management, Project Management, Inspection, Oversight and <br />delivery of Public Work services, <br />In. the past the City has utilized used professional and administrative staff on as needed basis to meet the <br />goals and objectives of the City in the delivery of quality, on time services, The staff services are an <br />extension to the current workibrce and work in conjunction to better serve and complement the needs of <br />the Public Works Agency. <br />In summary, tho City of Santa Ana is soliciting; proposals from qualified firing to provide enrginoering, <br />technical, and administrative support services for Public Works. This request 'for proposal (RFp) <br />provides interested qualified firms with the information enabling them to submit a Service Bid Proposal <br />and to .provide the services described heroin. <br />Deserfution of Work: <br />On as needed basis, the Consultant/s will provide the City with professional staff to perform <br />engineering, technical and administrative tasks on the delivery Public Work Services, These tasks may <br />include englneering design far: street rehabilitation and street widening projects plans and specifications. <br />Underground utility design aid review for water, sower and storm drain plans and specifications, Next, <br />Electrical and Mechanical consulting, review and design of plans and specifications for water <br />Infrastructure OX, wells, pump stations, sewer lift stations). Also, landscaping and irrigation system <br />design for public work projects, In addition, and including traffic signal design, road striping, survey <br />services, contract management, project inspection and oversight, and admirdstrative support services. <br />The list of positions the Consultant/s might treed to fill include the following; <br />AuIal eering/Tee ntc 41 <br />• Project Engineer <br />• Senior Civil Engineer (PE License Required) <br />+ Assistant Engineer lI, (Civil, Electrical, Mechanical) <br />City of Setnta Ana RFP 16-ph6 <br />