My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:11:51 PM
Creation date
12/22/2015 10:27:56 AM
Metadata
Fields
Template:
Contracts
Company Name
PTM General Engineering Services Inc.
Contract #
Various
Agency
Public Works
Council Approval Date
12/1/2015
Expiration Date
9/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 14 6799: New Traffic Signal on Newhope St and Camille St <br />PROJECT NO. 14-6800: Trafflr. Signal Modification on Segerstrom Ave and Bear St <br />TO: CITY COUNCIL, OF THE CITY OF SANTA ANA <br />FROM: PTM General Engineering Services, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the <br />proposed work, that they have examined the Contract Documents in its entirety and hereby <br />proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />Proieot # 14-6799 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Traffic Signal Installation on Newhope St & <br />1 <br />LS <br />$ <br />$ <br />Camille St <br />9g0W <br />C,S� <br />2 <br />GTT Emergency Vehicle Preemption System <br />1 <br />_LS <br />Per Plant�r'_� <br />3 <br />Install 2" PVC Conduit Per Plan <br />400 <br />LF <br />$ <br />$ <br />`�f a <br />?ZOO <br />4 <br />Install 3" PVC Conduit Per Plan <br />50 <br />LF <br />$ <br />$ <br />5 <br />Install 4" PVC Conduit Per Plan <br />300 <br />LF <br />$ <br />$ <br />iQS oo <br />6 <br />Install No. 6 pull Box <br />10 <br />EA <br />$ <br />$ <br />&o <br />7 <br />Install Large Pull Bax (N40 with N407 Ud) <br />1 <br />EA <br />$ <br />$ <br />-Box <br />1?0 <br />8 <br />Install Edison Pull <br />-I <br />EA <br />$ <br />$ <br />9 <br />Install Traffic Signal Loop Detector <br />14 <br />EA <br />$ <br />$ <br />(Type D Loop) <br />`37 cli <br />5/80 <br />10 <br />Install Bicycle Loop Detector <br />6 <br />EA <br />$ <br />$ <br />(Type E Loop) <br />7_70 <br />Q G `Z, 0 <br />11 <br />install Bicycle Loop Detector <br />2 <br />EA <br />$ <br />$ <br />(Type QLoop) <br />7 °0 <br />rt <br />%4/0 <br />12 <br />Construct 4" PCC Sidewalk <br />150 <br />SF <br />$ <br />$ <br />BP- i <br />
The URL can be used to link to this page
Your browser does not support the video tag.