My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:49:01 AM
Creation date
12/22/2015 10:27:56 AM
Metadata
Fields
Template:
Contracts
Company Name
PTM General Engineering Services Inc.
Contract #
P14-6799, 14-6800
Agency
Public Works
Council Approval Date
12/1/2015
Expiration Date
9/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 14-67M New Traffic Signal on Newhope St and Camillast <br />PROJECT NO. 14-6800! Traffic Signal Mod if[cation on Segorstrom Ave and Bear St <br />DIFFERING SITE CONDITIONS <br />The undersigned, is submitting this proposal for performing by contract the work required by <br />these bid documents, certify to comply with the following: <br />a. Contractor's Notification <br />Promptly notify the Agency's Engineer if you find either of the following conditions: <br />1. Physical conditions differing materially from either of the following: <br />• Contract documents <br />• Job site examination <br />2. Physical conditions of an unusual nature, differing materially <br />from those ordinarily encountered and generally recognized as <br />inherent In the work provided for in the Contract <br />Include details explaining the information you relied on and the material <br />differences you discovered. if you fall to promptly notify the Engineer, you waive <br />the differing site condition claim for the period between your discovery of the <br />differing site condition and your notification to the Engineer. <br />If you disturb the site after discovery and before the Engineer's investigation, you <br />waive the differing site condition claim. <br />b. Engineer's investigation and Decision <br />Upon your notification, the Engineer investigates job site conditions and: <br />1. Notifies yo ,whether to resume affected work <br />2. Decides then the condition differs materially and is cause for an <br />adjustm t of time, payment, or both <br />Signed <br />Title Elizabeth H. Mendoza de McRae, President/CFO <br />Firm PTM General Engineering Services, Inc. <br />Date 10.05.2015 <br />BP -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.