My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
PTM GENERAL ENGINEERING SERVICIES INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2024 3:11:51 PM
Creation date
12/22/2015 10:27:56 AM
Metadata
Fields
Template:
Contracts
Company Name
PTM General Engineering Services Inc.
Contract #
Various
Agency
Public Works
Council Approval Date
12/1/2015
Expiration Date
9/6/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />Construction Contract <br />PROJECT NO. 14.6799 & 14-6800 <br />TRAFFIC SIGNAL INSTALLATION ON NEWWOPE STREET AT CAMILLE STREET <br />AND MODIFICATION ON SEGERSTROM AVENUE AT BEAR STREET <br />This CONSTRUCTION CONTRACT is made and entered into this 13day of December, 2015, <br />by and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal <br />corporation organized and existing under the Constitution and laws of the State of California, <br />hereinafter referred to as "CITY" and PTM General Engineering Services Inc., <br />hereinafter referred to as "CONTRACTOR". <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows: <br />1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Traffic Signal Installation on Newhope <br />Street at Camille Street & Traffic Signal Modification on Segerstrom Avenue at Bear Street, <br />hereinafter referred to as the "Work of Improvement", identified in and in accordance with <br />the Contract Documents prepared by the City's Public Works Agency and approved by the <br />City Council. <br />2, The complete Construction Contract consists of the "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Project Plans <br />• Required Contract Provisions Federal -Aid Constriction Contracts <br />(Form FHWA 1273) <br />• Davis -Bacon Act and Wages <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the <br />Work of Improvement the stun total amount not to exceed $373,973.00, as set forth and <br />identified in the BID PROPOSAL, which is attached hereto acrd incorporated b,erein as <br />Exhibit "A". The BID PROPOSAL contains a schedule of unit price(s) or lump Stan(s) <br />based on approximate quantities only, and the City does not expressly or by implication <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.