Laserfiche WebLink
3.0 Project Tasks and Deliverables <br />3.1 Proposed MDC Project Tasks & Associated Deliverables <br />Our proposed tasks to complete the project are as follows: <br />1. Phase 1- Complete initiation and planning processes to contribute towards a detailed project <br />schedule and budget to include: <br />a. Review and document: current network infrastructure for mobile wireless access and <br />data access with SAPD CAD System and access to ancillary systems, and databases. <br />Document final requirements and research solution. <br />b. Review current access authentication and document requirements for the desired <br />methodology for advanced authentication in accessing secured databases and research <br />solution, <br />c. Review and document requirements for replacement mobile computing hardware to <br />include hardware capable of advanced authentication for data access and modems <br />capable of communicating with existing;' cellular technology. <br />d. Developdetailed project schedule and cost estimate based on procurement of new <br />mobile computer devices and desired authentication process. <br />2. Phase:2 -Complete execution and implementation of upgraded system to include: <br />a. Develop system design and installation requirements for upgrading mobile hardware. <br />b Coordinate a field test of the SAPD's selected mobile computer device and review <br />feedback from testers. <br />c. Execute installation, and acceptance testing on test system prior to rollout throughout <br />the fleet: <br />INBOURNE <br />('46Ksu:rivc. tic: <br />11 <br />