My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SA STADIUM CONCRETE REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
23A - PROJ - SA STADIUM CONCRETE REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:55:30 PM
Creation date
1/14/2016 2:02:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 16 -2656 <br />SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Metro Builders & Engineers Group, Ltd. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the <br />proposed work, that they have examined the Contract Documents in its entirety and hereby <br />proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Prire <br />Amount <br />1 <br />Mobilization (Not to —Exceed 10 %of Total <br />Contract) <br />1 <br />LS <br />$NP90 <br />$ 2,0 000 <br />2 <br />Temporary Supportt* <br />20 <br />EA <br />$ p9 0 <br />I1 <br />$ <br />LID/ aoo <br />3 <br />Parapet Wall Replacement <br />4 <br />EA <br />9-0 <br />1 <br />4 <br />Degraded Beam Replacement (6" avg. <br />length) <br />4 <br />EA <br />$ 6� 0 V <br />, <br />4 / �7Qa <br />$ b <br />5 <br />Extensive Beam Replacement (4' avg, <br />length) <br />EA <br />$ �, �„q 0 <br />! <br />$ 0 i] <br />8�/ <br />6 <br />Concrete Spell Re pair w/ Exposed Reber <br />(3" avg. depth) <br />F2,400 <br />SF <br />$! 09 <br />$� 5 b p D� <br />) <br />Concrete Spalling (P' avg, depth)* <br />SF <br />$ �) <br />$ L) �. ',V,0 <br />J <br />II <br />Cracks Epoxy Injection* <br />360 <br />LF <br />$ 27,7t <br />$ <br />9 <br />I Galvanized Plate at Post <br />(Complete -in- place) <br />120 <br />EA <br />$ r, I �' P <br />—1 0 <br />$ 7S <br />f <br />10 <br />Joint Seal with Backer Rod* <br />1,000 <br />LF <br />$ S DID <br />$ y <br />D <br />11 <br />Temporary Construction Signs <br />4 <br />EA <br />El of 17 <br />23A -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.