My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SA STADIUM CONCRETE REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
23A - PROJ - SA STADIUM CONCRETE REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:55:30 PM
Creation date
1/14/2016 2:02:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 16 -2656 <br />SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR <br />t This bid item is considered a Specialty Item per Section 2 -3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within Sixty (60) working days for Phase I and Phase II after issuance of the <br />Notice to Proceed. Immediately after contract award, contractor must be prepared to submit <br />all required documents, structural calcs, and fabrication submittals. Preconstruction meeting <br />shall tape place one week after Council award on January 19, 2016. The contractor shall <br />commence construction on or before February 8, 2016. <br />Phase I: Contractor shall complete all work on the west side of the stadium within the first 30 <br />working days. Liquidated damages shall be $1,000 each day if not completed after the first 30 <br />working days. <br />Phase II: Contractor shall complete work on the east side of the stadium within 30 workings <br />days after Phase I has been completed or sooner if Phase I has been completed before its 30 <br />working days requirement. Liquidated damages shall be $1,000 each day if not completed after <br />the last 30 working days. Deadline for completing all work shall be May 20, 2016. <br />The liquidated damages amount in lieu of the amount specified in Subsection 6 -9 of the <br />Standard Specifications shall be $1,000 per calendar day after the Final Completion of the 60 <br />working days, including Bid Alternative(s) if awarded, as specified herein for contractor to <br />achieve Final Completion of the entire work. <br />Name of Firm Metro Builders & Engineers Group, Ltd. <br />Signature of BIDDER <br />Title President <br />(if an individual, so state) <br />BP -3 of 17 <br />23A -12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.