Laserfiche WebLink
IX Booster Punta Lead /Lag Sc uence <br />A. hardwired Ftnrctiorrs <br />1. None <br />B. PLC Functions <br />1. Sequence the ptrnnps automatically ON and OFF, to following staging of pumps to maintain <br />the discharge pressure setpoint through the PID control of the LEAD VI "D, and monitoring <br />the percent speed of the LEAD VFD to dotennine when to STAGE LIP or STAGE. DCTab'N. <br />2. If the system DEMAND IS INCREASING, causing the LEAD VFD to increase speed to <br />above it programmable value (default is 9211/r, speed), then start a virtual timer which, will be <br />reset if the speed ever drops to below 92%, When a adjustable time delay as set by <br />SCADArR MI (cLetjwlt is S ramutts) hers elapsed, commence turning ON or OFF the <br />appropriate pumps to -o to the next stage. Each STAGING I II' control will have, acl_justable <br />tirners I'or the affiected pumps to "smooth out " the dynamic change in Pressure conditions <br />during the stage transition. It is the intent to have the LEAD VFD always be operation in an <br />"efficient range of slush" while keeping the discharge pressure stable under I "ID <br />CONTROL. This will also facilitate a reduction in energy costs. <br />3. If the system DEVAND IS DEC ICE ASIN -0, causing the LEAD VFD to decrease speed to <br />below a programnmble value (default is 75'X, spocd), theca start a virtual tinier which will he <br />reset if the speed ever rises above 75%. Wtren a adjustable t.irne delay as :net by <br />SCADAi 1MI (del`ault is 5 minutes) has ehrpsed, cornmerace turning; CAN or OFF the <br />appropriate Pumps to go down to the nest stage. Each STACTING DO%''N control will have <br />wdjustable timers for the affected pumps to "smooth out" the dynamic change in pressure <br />CC1nt1t1fIrIS flUl'llnk the Stage transition. <br />4, 11' no pumps arc ON, the. PLC shall monitor the discharge pressure and when it drops to a <br />PLC programmable integer below the "active" pressure setpoint, then start a virtual I'LC: <br />timer. If the discharge pressure stays below this "start-up" pressure setpoint for the errtir'e, <br />urntiguous time (default ol` 5 minutes,), then command the LEAD VFD to come ON. The <br />lower alien -up setpoint from the station discharge setpoint is to insure that the LEAD VFD <br />will not have frequent starts and stops hovering around the station discharge. setpoint. <br />5. If only the LEAD VFD is ON, and the discharge pressure strops below the station setpoint <br />causing the VFD to go to minimum speed, then start a programmable virtual PLC timer <br />(default of 10 minutes) to shut down the LEAD VFD under this very low demand <br />circunstance. <br />6. If llae TOO (Time of USE) function is active, only allow staking up through STAGE 4 (max <br />Of 2 pumps ON). Do not allow, any 5l'aging N. 5 -7, tit this circumstance,, the UP STACTF <br />timer would "not be active " at Stage 4. <br />City of Santa Ana�RyF.P 15 -105 <br />2 bTX15b <br />