My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25I - AGMT - PUMP STATION SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
25I - AGMT - PUMP STATION SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 5:05:15 PM
Creation date
1/14/2016 2:24:13 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25I
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A, Hardwired Functions <br />1. Send at common "Access .Door Open" signal to the PLC if any of` the four doors into the <br />pump station or clectricul MITI is aletected open, <br />2. Scud it Common ".Access Bypass" signal to the PLC:' if citht:r of the two "Access Bypass <br />Alarm" switches are: activated, <br />B. PLC functions <br />1. Monitor the security "Access Door Open" and "tntrusion Alarm Bypass" signals and <br />,generate an alarm (latch) if the "Bypass" signal is not dmetctl rant I minute ol" the "Access <br />Door Open" signal being roceived. Reset the ular•m WOW Bypass signal is dete.Oed err the <br />alarm is reset at the FINIL <br />C, 1-INII Functions <br />1. Show status of door switches, bypass switches, and access alarms. <br />NIX C.nrergeucy Gencrutor Stet) Sectnenca <br />The backup generator will be provided by other:;. The PC.S integrator shall provide the Programming <br />and integration with the backup generator as follows: <br />A. Hardwired Functions <br />1. TUD. <br />B. PLC Functions <br />1. The automatic transfer switch will be monitored Farr status and alarm as shown in the P&lDs <br />and as listed in the VO schedule. Automatic transfer switch (ATS) position indicates utility <br />poww er status. <br />1 "<'v'hen plant power fails, as indicated by a three- phase power monitor wired to the foal -side <br />of the ATS, the PLC shall immcdiately shut down all PLC" Controlled equipment, Fifteen <br />seconds after ,plant power is restored, as indicated by the three -phase power monitor wired tax <br />the load -side of the ATS, the PLC's shall begin wquentially restarting ttre pumps so than no <br />two pumps start at the same time. Punip re- starts slralt be staggered by at least 20 seconds <br />cacti by the PLC using tune delay logic. <br />3. The PLC shall not call more than three pumps to rata when the station is on emergency <br />power. <br />C, HMI Functions <br />t. Show status of the ATS switchcs. <br />2. Other function T9D. <br />City of Santa Anna RFP 15-105 <br />
The URL can be used to link to this page
Your browser does not support the video tag.