My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
31B - CUP - 601 S SANTA FE ST
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
31B - CUP - 601 S SANTA FE ST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 5:06:09 PM
Creation date
1/14/2016 2:39:28 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
31B
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP No. 2015 -23 <br />December 14, 2015 <br />Page 3 <br />This location is optimal to provide the coverage necessary for existing and expanding service. The <br />proposed facility will provide a benefit to Santa Ana residents, businesses and motorists who subscribe <br />to SBA Communication's services by expanding cellular and data coverage in the area. The proposed <br />facility will be in compliance with Federal law that governs health related issues for wireless facilities, <br />including safety regulations from the Federal Communications Commission (FCC) and Federal <br />Aviation Administration (FAA). <br />Finally, the use will continue to comply with all provisions pertaining to the construction and installation <br />of wireless facilities identified in Chapter 41 (Zoning Code) of the SAMC. The facility will not adversely <br />affect the General Plan as cellular facilities that are designed to be compatible with the surrounding <br />environment are consistent with the goals and objectives of the Land Use Element. Goal 1 promotes <br />a balance of land uses to address community needs, which includes means of communication that will <br />be served by the proposed monopole. In addition, Goals 3 and 5 require preservation of neighborhood <br />character and integrity as well as mitigation of developments' impacts. The monopole's location <br />minimizes visual impact on the area and assists with the stealthing of the equipment. Further, Policy <br />2,2 encourages land uses that accommodate the City's needs for services. Renewing the facility for a <br />further 10 years will allow the facility to provide the cellular services that are readily available for <br />business owners, workers, and residents in the immediate vicinity. <br />Public Notification <br />The project site is not located within the boundaries of an established Neighborhood Association. <br />The project site was posted with a notice advertising this public hearing, a notice was published in <br />the Orange County Reporter and notices were sent to all property owners and occupants within 500 <br />feet of the project site. At the time of this printing, no correspondence, either written or electronic, <br />had been received from any members of the public. <br />CEQA Compliance <br />In accordance with the California Environmental Quality Act (CEQA) the recommended action is <br />exempt from CEQA per Section 15061(b)(3). This exemption applies to projects where it can be seen <br />with certainty that there is no possibility that the activity in question may have a significant effect on <br />the environment. The project proposes to renew an existing major wireless facility through the <br />issuance of a new CUP. No expansion of square footage or physical land disturbances are proposed <br />as part of the project. Categorical Exemption Environmental Review No. 2015 -74 will be filed for this <br />project <br />Strategic Plan Alignment <br />Approval of this item supports the City's efforts to meet Goal No. 3 Economic Development, <br />Objective No. 2 (create new opportunities for business /job growth and encourage private <br />development through new General Plan and Zoning Ordinance policies), as well as Objective No. 5 <br />(leverage private investment that results in tax base expansion and job creation citywide). <br />31 B -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.