My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - WARNER ASSESSMENT DISTRICT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
55B - RESO - WARNER ASSESSMENT DISTRICT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 5:08:37 PM
Creation date
1/14/2016 3:11:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ASSESSMENT DISTRICT NO. 2015 -01 <br />(WARNER INDUSTRIAL COMMUNITY) <br />PART <br />DESCRIPTION OF WORKS OF IMPROVEMENT <br />The City of Santa Ana is using assessment financing to improve the pavement of the <br />local, interior roadway network within the Warner Industrial Community Assessment <br />District (WIC). The boundaries of this Assessment District and the included parcels are <br />depicted on the Boundary Map and Assessment Diagram in Part 4 of this Report. <br />The location of the district may be generally described as being within the following <br />streets and landmark boundaries: <br />Beginning at the intersection of Harbor Boulevard and Warner Avenue, on <br />the north side of Warner Avenue, east to the abandoned Union Pacific <br />Railroad line, then south along the eastern edge of the abandoned railroad <br />line to Segerstrom Avenue, then east along the northern edge of <br />Segerstrom Avenue to an Orange County Flood Control Channel <br />(D03) /Greenville Banning Channel, then north along the western edge of <br />the channel, continuing north on the western edge of Fairview Street <br />(where it crosses Harvard Street) to the southern edge of Centennial Park, <br />then west along the southern edge of the park to the Santa Ana River, <br />then south along the eastern edge of the river, and continuing south along <br />the eastern edge of Harbor Boulevard to the point of origin at Warner <br />Avenue. <br />The streets to be improved within the district include: <br />• Adams Street <br />• Anne Street <br />• Castor Street <br />• Central Avenue <br />• Fordham Avenue <br />• Harvard Street <br />• Maywood Avenue <br />• Otis Street <br />• Pendleton Avenue <br />• Susan Street <br />• Yale Street <br />Only parcels having access to the streets being improved were included, therefore, if <br />parcels have direct access to major thoroughfares, and none of the streets listed above, <br />these parcels were excluded from the district. The major thoroughfares include: <br />• Fairview Street • Segerstrom Avenue <br />• Harbor Boulevard • Warner Avenue <br />For details of the work to be performed, please refer to the engineering drawings and <br />specifications on file with the Superintendent of Streets in the office of the Public Works <br />Agency of the City of Santa Ana. <br />55B -22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.