My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - AGMT - PARKS LANDSCAPE SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
25B - AGMT - PARKS LANDSCAPE SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:57:51 PM
Creation date
1/14/2016 3:36:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25B
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
36" beyond the skinned infield arc, and other designated ball diamond turd' areas. Infield <br />maintenance shall not be part of this REP. <br />1.3 Edging and Detailing <br />Edging /detailing of the entire site shall be performed at the same time rnowing occurs. <br />The City prefers that all edging shall be performed with the use of a McClain's edger or <br />approved substitute walk - behind or fixed blade stick edger. Contractor shall edge all <br />turf adjacent to all improved hard surfaces such as concrete, decomposed granite, <br />asphalted concrete paved areas, pavers, etc. <br />Edging /detailing may occur with string trimmers around park amenities that are not <br />immediately adjacent paved surfaces. <br />Chemical detailing of turf may occur only with the Director's Representatives approval. <br />If chemical detailing is performed, the Contractor shall spray maximum 3" and use the <br />string trimmer to remove the treated turf within one (1) week after symptoms of <br />phytotoxicity become recognizable. <br />The Director's Representative may require the Contractor to use string or rope lines to <br />edge straight lines if the Contractor's staff fails to achieve this quality without this <br />method. <br />The Contractor shall detail around trees, along walls /fences and other park amenities first <br />using a sharpened shovel cut to establish a concentric round circle around trees, poles, <br />etc. Once the initial detailed circle is established a string trimmer may be used to <br />maintain the circle. Should the circle begin to deform the Director's Representative shall <br />direct the Contractor to repeat the detail process. Shovel cut detailing shall be repeated a <br />minimum of every 3 months to maintain crisp evenly round lines. <br />The Contractor shall detail turf not greater than 1" away from park amenities walls or <br />fences. Detail lines shall be made straight and shall be maintained straight. The <br />Contractor shall, at his own cost, supply sandy loam top soil and an approved turf sod to <br />reduce any existing bare soil areas along walls /fences that are greater than P. <br />2.0 Groundcover Care <br />2.1 The Contractor shall service ground cover /shrub beds on a bi- weekly basis. These areas <br />shall be maintained within their intended bounds and edged and /or detailed to keep the <br />beds looking manicured at all times. Groundcovers shall not be allowed to grow into <br />other groundcover beds, shrubs, vines or on trees. All plant material shall be maintained <br />in an attractive and healthy condition. <br />2.2 Ground cover shall not encroach into lawns, shrubs, adjacent desirable bare areas, curbs, <br />wall fixtures, furniture, beneath and /or into other plants, etc, All sites shall be cleaned <br />immediately following each edging /detailing, including streets. <br />25B -13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.