My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - PED COUNTDOWN HEADS AND PUSH BUTTONS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
01/19/2016
>
20A - AA - PED COUNTDOWN HEADS AND PUSH BUTTONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2016 4:54:44 PM
Creation date
1/14/2016 3:45:48 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
1/19/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 3 <br />Construction Contract <br />PROJECT NO. 15 -6830 <br />PEDESTRAN COUNTDOWN HEADS AND PUSH BUTTONS <br />This CONSTRUCTION CONTRACT is made and entered into this 19 day of January 2016, by <br />and between the CITY OF SANTA ANA, CALIFORNIA, a charter city and municipal <br />corporation organized and existing under the Constitution and laws of the State of California, <br />hereinafter referred to as "CITY" and Siemens Industry, Inc., hereinafter referred to as <br />"CONTRACTOR ". <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as <br />follows; <br />I. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost <br />and expense necessary to construct and complete in a good and workmanlike manner and to <br />the satisfaction of the City Engineer of the CITY, the Pedestrian Countdown Heads and Push <br />Buttons, hereinafter referred to as the "Work of Improvement ", identified in and in <br />accordance with the Contract Documents prepared by the City's Public Works Agency and <br />approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents," as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Project Plans <br />• Required Contract Provisions Federal -Aid Construction Contracts <br />(Fonn FFIWA 1273) <br />• Davis -Bacon Act and Wages <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the <br />Work of Improvement the sum total ainomlt not to exceed $596,076.00, as set forth and <br />identified in the BID PROPOSAL, which is attached hereto and incorporated herein as <br />Exhibit "A ". The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) <br />based on approximate quantities only, and the City does not expressly or by implication <br />Page 1 of <br />20A -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.