Laserfiche WebLink
"New construction" means, for the purposes of building <br />landscape or other new landscape such as a park, playground, or greenbelt without an <br />associated building. <br />11 pervious" means any SU'--Ge or ss- <br />0....0- x 0 x 0 . <br />•. page-: <br />t4reUgh C 'x <br />"Permit' means an authorizing document issued by local agencies for new <br />construction or rehabilitated landscape. <br />pstima amount of wateF-Reeded by plants. Fer-�peses of this-MiGle, the plan <br />wat4r­use plants is w 0 0 <br />:x <br />0­4 <br />to • Plant G G. C <br />Rpisourees •.. 0- <br />^G x 0 <br />te 00.0 •: .0^ <br />0 0 ` 0 .0 • x : <br />0 ^ 0 :t'E11l4 T� <br />'• es .s <br />A. <br />"Rehabilitated landscape" means any re-landscaping project that requires <br />Guidelines permit, plan check, or development review and meets the applicability criteria of the <br />•• • landscape area is greater than 2,600 <br />is Cno - area, and the MGdAGati9qs-a_re�ed49 <br />square fee , of the tetal lands-ap <br />events using er e -- <br />:. <br />:e s <br />I-PASO-99 9-99" ----s an area of the IandsGape-dedieated-6deV-W <br />64 x -getab4-gwdens—,afeas irrigated with reGyGled <br />s es •x <br />Ordinance No. NS-XXX <br />Page 8 of 11 <br />75C -14 <br />