Laserfiche WebLink
Appendix E: Certificate of Completion <br />LANDSCAPE INSTALLATION CERTIFICATE OF COMPLETION <br />I hereby certify that: <br />(1) I am a professional appropriately licensed in the State of California to provide <br />professional landscape design services for: <br />(project name, mailing address and telephone). <br />(2) The landscape project for the property located at <br />(provide street address or parcel <br />number(s)) was installed by me or under my supervision. <br />(3) The landscaping for the identified property has been installed in substantial conformance <br />with the approved Landscape Documentation Package and complies with the requirements of the <br />City of Water Efficient Landscape Ordinance (Municipal Code <br />Sections ) and the City of Guidelines for <br />Implementation of the City of Water Efficient Landscape <br />Ordinance for the efficient use of water in the landscape. <br />(4) The following elements are attached hereto: <br />a. h-iigation scheduling parameters used to set the controller; <br />b. Landscape and irrigation maintenance schedule; <br />c. Irrigation audit report; and <br />d. Soil analysis report, if not submitted with Landscape Documentation Package, and <br />documentation verifying implementation of the soil report recommendations. <br />(5) The site installation complies with the following: <br />a. The required irrigation system has been installed according to approved plans and <br />specifications and if applicable, any prior approved irrigation system alternatives. <br />Yes —No <br />b. Sprinklers comply with ASABEACC 802 -2014 Landscape Irrigation Sprinkler & <br />Emitter Standard. <br />Yes —No <br />(6) The information I have provided in this Landscape Installation Certificate of Completion <br />is true and correct and is hereby submitted in compliance with the City of <br />Guidelines for Implementation of the City of Water Efficient Landscape <br />Ordinance. <br />Ri1I <br />