Laserfiche WebLink
Appendix G: Irrigation Plan Checklist <br />Tlus is a voluntary compliance tool template developed by the Irrigation Association. <br />IRRIGATION PLAN CHECKLIST <br />Please complete the following checklist by checking all appropriate categories under <br />APPLICANT column, indicating compliance with these content requirements. All submitted <br />plans shall contain the following information: <br />LANDSCAPE PLAN NUMBER: <br />NAME OF PROJECT: <br />Applicant Planner <br />[ ] 1. Prevailing winds [ ] <br />[ ] 2. Slope aspect and degree of slope [ ] <br />[ ] 3. Soil type and infiltration rate [ ] <br />[ ] 4. Vegetation type [ ] <br />[ ] 5. Microclimates [ ] <br />[ ] 6. Expansive or hazardous soil conditions [ ] <br />[ ] 7. Water harvesting potential [ ] <br />[ ] 8. Available water supply, including non - potable and recycled water [ ] <br />All pertinent system information is indicated, including: <br />[ ] 9. Irrigation zones substantially corresponding to hydrozones on the landscape [ ] <br />plan and labeled by precipitation rates and method of application <br />[ ] 10. Water meters [ ] <br />[ ] 11. Tap -in location [ ] <br />[ ] 12. Static water pressure at the point of connection [ ] <br />[ ] 13. System controller [ ] <br />[ ] 14. Rain sensor /shut -off device [ ] <br />[ ] 15. Backflow preventers [ ] <br />[ ] 16. Shut -off valves and zone control valves [ ] <br />[ ] 17. Main line and lateral piping [ ] <br />[ ] 18. Sprinkler heads [ ] <br />[ ] 19. Bubblers and drip irrigation tubing runs [ ] <br />[ ] 20. Type and size of main irrigation system components [ ] <br />[ ] 21. Total required operating pressure for each control valve /zone [ ] <br />[ ] 22. Graphic depiction of the locations of irrigation system components [ ] <br />[ ] 23. Total required operating pressure for each control valve /zone [ ] <br />[ ] 24. Any supplemental stormwater and/or runoff harvesting [ ] <br />System design is in conformance with the following standards: <br />[ ] 25. Certification of Professional Qualifications, attached [ ] <br />[ ] 26. Pedestrian surfaces located on plan [ ] <br />[ ] 27. Equipment installed flush with grade for safety [ ] <br />[ ] 28. Compliance with local codes [ ] <br />[ ] 29. Overspray onto impervious areas minimized [ ] <br />