My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C3 OFFICE SOLUTIONS 2 - 2015
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2021
>
C3 OFFICE SOLUTIONS 2 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 12:42:35 PM
Creation date
2/9/2016 5:44:17 PM
Metadata
Fields
Template:
Contracts
Company Name
C3 OFFICE SOLUTIONS
Contract #
A-2015-240
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
10/20/2015
Expiration Date
10/31/2016
Insurance Exp Date
5/23/2017
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Services <br />of our ability, we will care for the Printers and notify the user when <br />we can no longer repair the device, Because the Printers are city <br />owned devices, we cannot replace the units. We have <br />recommended replacements in the past and will continue <br />4. C3 is committed to offering City Departments including its twenty-four operations <br />optimum uptime. C3 will provide loaners onsite to address the need for down <br />printers Monday to Friday. When a loaner is used to replace a down printer, <br />Santa Ana PD will notify C3 of this event and C3 will send a technician to repair <br />the down printer during normal business hours. Once the printer is repaired, the <br />loaner will be put back into loaner status. C3 In collaboration with Santa Ana <br />P.D. will assess the quantity and model types of the loaners. <br />a. There are currently 3 printers loaners on site at the City of Santa Ana PD. <br />The police department will also receive emalls to confirm closure. <br />b. C3 will close all service calls with Santa Ana PD IT staff with included <br />address pdprinteradrnins@santa-ana.org <br />5. C3 uses only OEM parts and supplies for all our Sharp and Ccnon MFP's, Allot <br />the Sharp and Canon supplies and parts are Included in the Service Agreement. <br />Desktop printers may be supplied by LMI (newly manufactured compatibles not <br />refills). C3 will provide full warranty of all parts and supplies and guarantee our <br />workmanship. <br />6. C3 will offer a loaner if the City is down for more than one day with similar <br />capabilities and features. See response 3.e.ii <br />7. Preventive Maintenance is pre -scheduled by C3 based on manufacturer's <br />recommendations and may be scheduled at a mutually acceptable time.C3 <br />completes preventative maintenance on devices once we are able to see <br />volumes and alerts. Currently we complete total call process. When the <br />technician performs service on the machine, he is checking to see if items are <br />worn and are in need of repair. The life expectancy of the consumables are also <br />checked. <br />8. For emergencies or urgent matter - C3 is local and can easily hand deliver toner <br />from our warehouse. These services will be included in our basic pricing and <br />there will not be any additional costs. In addition, C3 will provide additional <br />toners to have on hand for such emergencies, <br />9. C3 has always received glowing reviews for training end-users and providing <br />ongoing support. The more the users are trained, the less service calls we get. <br />C3 will provide videos and user manuals which can be accessed 24 hours per <br />day to supplement in-person trainings. C3 will provide as much support as <br />necessary to maximize utilization of the devices, <br />a. C3 will conduct retraining as needed to refresh features and <br />troubleshooting. <br />10. Our analysts will configure all features of the copiers and MFP's, including but not <br />limited to copying, faxing, network printing, all available forms of scanning, and <br />integration with back end Technology Services. These services are all inclusive in <br />our bid pricing. <br />11. C3 will not sub -contract any work to any other vendor. <br />12. Tricia Sanchez as your Account Manager will continue to be the first point of <br />contact. Davis Tran will be the second point of contact for minor projects. We <br />Proprietary and Confidential P a g e 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.