My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19E - FLOOD CONTROL UPDATE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
02/16/2016
>
19E - FLOOD CONTROL UPDATE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 3:09:43 PM
Creation date
2/11/2016 2:47:45 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
19E
Date
2/16/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORM DRAIN MASTER PLAN <br />January 7, 2016 <br />Page 2 <br />The master plan provides two protection level goals: <br />o Protection level in residential streets to prevent property damage due to flooding in a 100 year <br />frequency storm. <br />o Protection level in arterial streets to keep at least one lane of travel free of flooding in a 25 year <br />frequency storm. <br />Cost of Master Plan Improvements <br />Full implementation of the MPD would not eliminate all deficiencies, and localized flooding would still <br />occur. However, we will be updating the MPD study to incorporate the latest technological advances and <br />infiltration devices (green technology) that would alleviate localized flooding at much lower costs and <br />bring down the overall MPD costs. <br />The total cost to make all MPD improvements to achieve our protection level goals is about $350 Million. <br />By incorporating the latest technology, the total cost may be reduced to $300 Million. <br />A more manageable implementation of the top 10 improvements which provide relief to the most flood <br />prone watersheds is about $150 Million. Attached is a map showing the top 10 priority improvements <br />and system build -out. <br />Storm Drain System Improvements over the last 10 years <br />The previous Master Plan of Storm Drainage (MPD) developed in the 1990's has proven to be a valuable <br />resource since the city has been able to add flood protection infrastructure to our system as funding or <br />project opportunities have materialized. <br />Over the last 10 years, the City has added a small number of new storm drain lines and connector pipes, <br />catch basin, and pervious concrete at various locations throughout the City. These projects were <br />constructed primarily as part of street improvement projects. The following list summarizes the drainage <br />system improvements added over the last ten years, providing a combined $5 million value: <br />o Grand Avenue, First Street to Fourth Street - New Storm Drain <br />o Third Street, Birch Street to Spurgeon Street - New Storm Drain <br />o Various Storm Drain Upgrades - Pendleton /Forest, Birch Street Cul -de -sac, and Myrtle /Pacific <br />o Center Street, Edinger Avenue to La Verne Avenue - New Storm Drain <br />o Centennial Road, 1100' w/o Fairview - New Storm Drain <br />o College Avenue, Martha Lane to Washington Avenue - New Storm Drain <br />o Edinger, 700' w/o Fairview - New Storm Drain <br />o Bristol Street, McFadden to Civic Center- New Storm Drain <br />o Plaza of the Sun - New Storm Drains to eliminate the annual flooding in the Civic Center Plaza <br />o Fourth Street, Minter to Garfield - Pervious concrete to promote infiltration and reduce flooding <br />19E -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.