Laserfiche WebLink
16/17 FEATURED <br />PROJECTS <br />Street Light LED Water/Sewer <br />IP3Fiber Optics <br />ConversionBond <br />$80,000,000$TBD <br />$10,000,000$37,500,000 <br />Pavement Management Pavement Management Study the Implementation Study the Implementation Purchase Street Lights Purchase Street Lights Water and Sewer Water and Sewer <br />•••••••• <br />ProgramProgramof a Citywide Fiber Optics of a Citywide Fiber Optics from SCEfrom SCEInfrastructure Infrastructure <br />SMSASMSANetworkNetworkFinance Through Finance Through ImprovementsImprovements <br />•••• <br />Bus Stop ImprovementsBus Stop ImprovementsReduced Rate SavingsReduced Rate Savings <br />•• <br />Citywide Bicycle Master Citywide Bicycle Master Replace with LEDReplace with LED <br />•••• <br />PlanPlanLower Energy Lower Energy <br />•• <br />Sidewalk/ADASidewalk/ADAConsumption and CostConsumption and Cost <br />•• <br />More Responsive More Responsive <br />•• <br />MaintenanceMaintenance <br />9 <br /> <br />