Laserfiche WebLink
Understanding of Need % Scope of Work <br />General Requirements <br />• Buckram agrees that project work shall be performed in conformance with the City <br />and tOCTA's policies, procedures and standards <br />• Bucknam shall have total responsibility for the accuracy and completeness of all <br />inspections performed and documents prepared. The documents provided under the <br />Agreement shall be of a quality acceptable to the City. The criteria for acceptance <br />shall be a product of neat appearance, well organized and technically and <br />grammatically correct. No assumption of the number of review rounds has been <br />taken <br />• Buckram will be using laptop/tablet based surveys (digital input/output); as a <br />deliverable a paper based forms shall be submitted to the City for the City's records or <br />the methodology for upload of electronic data collected shall be clearly defined and a <br />method for data verification provided <br />Project Deliverables <br />• Updated database in PAVER 7.0 (.e70 format; digital file on DVD/CD <br />o Updated M&R work data /tables <br />o Updated pavement condition survey data <br />o Updated Budgetary Analysis Scenarios <br />• Final PMP report; digital file on DVD/CDand 1 hard. copy <br />3-10 <br />