My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - FOSAZ FERRIS WHEEL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/01/2016
>
25E - AGMT - FOSAZ FERRIS WHEEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 1:54:10 PM
Creation date
2/25/2016 1:49:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25E
Date
3/1/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. With City's input, and in accordance with all applicable City ordinances and procedures <br />covering such matters as bid process, project administration requirements, and other legal <br />requirements, FOSAZ shall retain qualified consultants and contractors for the <br />geotechnical investigation, surveying, civil engineering, site plan, structural engineering, <br />and site improvements (including but not limited to the structural foundation) necessary <br />for the provision and installation of the Ferris Wheel, <br />C, Prior to construction and installation of the Ferris Wheel, FOSAZ shall provide to City all <br />materials related to the construction and installation of the Ferris Wheel, including <br />without limitation reports, surveys, studies, calculations, plans, and specifications. No <br />work shall commence without City's prior review and approval of such materials. <br />D. FOSAZ shall provide all funding and assume all costs related to the design, construction, <br />provision, installation, and inspection of the Ferris Wheel, including installation of all <br />necessary utilities, City shall pay for utilities upon operation. All work shall be <br />coordinated with City and Zoo staff. <br />E. Prior to operation of the Ferris Wheel, FOSAZ shall obtain all approvals and certificates <br />necessary under applicable federal, state, and local law, including without limitation <br />approval from the Amusement Ride and Tramway Unit of the California Department of <br />Industrial Relations or other government agencies responsible for amusement ride <br />oversight. <br />F. Prior to operation of the Ferris Wheel, FOSAZ shall provide City with all final plans, <br />drawings, as- builts, and similar documents. Operation of the Ferris Wheel may not <br />commence without City's approval. <br />2. OPERATION, MAINTENANCE, AND INSPECTION OF FERRIS WHEEL <br />A. At its sole cost, FOSAZ shall be responsible for the daily inspection, operation and <br />maintenance of the Ferris Wheel with qualified personnel to ensure its safe and <br />successful operation. Any subcontractors retained for these purposes must be approved <br />by the City. <br />B. FOSAZ shall operate the Ferris Wheel in accord with safety standards and protocols that <br />are best practices in the amusement ride industry. <br />C. FOSAZ shall comply with, coordinate, and obtain all approvals and certifications that are <br />required by the Amusement Ride and Tramway Unit of the California Department of <br />Industrial Relations or other government agencies responsible for amusement ride <br />oversight, including without limitation regular safety inspections conducted by a <br />Qualified Safety Inspector. <br />Page 2 of 8 <br />25E -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.