Laserfiche WebLink
7. The permit applicant shall insure that lessee or other user(s) shall comply <br />with the terms and conditions of this permit, and shall be responsible for <br />the failure of any lessee or other users under the control of permit <br />applicant to comply. <br />am <br />The permit applicant shall provide a coverage and cell site location map <br />for each existing and proposed facility in Santa Ana. <br />9. Locate all equipment and related appurtenances (appleton plug and <br />electric meter) on the inside of the existing equipment enclosure or inside <br />the building and underground all electrical power from the utility source <br />shown on the approved site plan. <br />10. Conditional Use Permit No. 2015-26 expires ten (10) years from the date <br />of City Council approval. <br />Resolution No. 2016 xx <br />Page 7 of 7 <br />31A -19 <br />