My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2016-01_3630 Westminster (The Line)
Clerk
>
Resolutions
>
PLANNING COMMISION
>
2016
>
RESO 2016-01_3630 Westminster (The Line)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2016 10:18:01 AM
Creation date
3/8/2016 10:17:51 AM
Metadata
Fields
Template:
PBA
Doc Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H. The applicant agrees to indemnify, hold harmless, and defend the City of <br />Santa Ana, its officials, officers, agents, and employees, from any and all <br />liability, claims, actions or proceedings that may be brought arising out of its <br />approval of this project, and any approvals associated with the project, <br />including, without limitation, any environmental review or approval, except to <br />the extent caused by the negligence of the City of Santa Ana. <br />Section 2. In accordance with the California Environmental Quality Act <br />(CEQA), the recommended action has been determined to be within the scope of the <br />previously certified Environmental Impact Report (EIR) No. 2014 -01, as that program <br />EIR adequately describes this activity for the purposes of CEQA, as per Sections <br />15162 and 15168 of the CEQA guidelines. It has been determined that no new <br />effects could occur and no new mitigation measures would be required. Thus, a <br />discretionary action can be taken on the proposed project since it is within the scope <br />of the project covered by the previously approved program EIR. <br />The project will comply with all mitigation measures as required by the approved <br />Mitigation Monitoring Program (MMP), as required by the environmental documentation <br />prepared for the Harbor Mixed Use Transit Corridor Plan. As required by the MMP, a <br />site impact analysis was performed to analyze any potential changes in area traffic <br />as a result of the proposed development. The site impact analysis is incorporated <br />herein by this reference. The analysis concluded that no additional significant <br />impacts would trigger the requirement for additional environmental review. <br />Section 3. The Planning Commission of the City of Santa Ana, after conducting the <br />public hearing, hereby approves Site Plan Review No. 2016 -01 as conditioned in Exhibit A <br />attached hereto and incorporated as though fully set forth herein. This decision is based <br />upon the evidence submitted at the above said hearing, which includes, but is not limited <br />to: the Request for Planning Commission Action dated January 25, 2016, and exhibits <br />attached thereto; and the public testimony, written and oral, all of which are incorporated <br />herein by this reference. <br />ADOPTED this 25th day of January 2016. <br />Resolution No. 2016 -01 <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.