Laserfiche WebLink
AGREEMENT NO. C -5 -3632 <br />EXHIBIT C <br />ARTERIAL PAVEMENT MANAGEMENT PROGRAM <br />FINAL PROJECT REPORT FORM <br />Date <br />OCTA <br />Instructions <br />The responsible agency should fill out the following: 1) Final Project Form, 2) Final Cost, 3) Certificate of <br />Completion. Page 4, the OCTA Staff Verification will be filled out by OCTA staff. In addition, the agency must <br />attach before (if available) and after photographs of the project site and the address or location of the site under <br />the Location and Scope of work section. <br />Project <br />Location and Scope of Work <br />Verification of Match <br />(Actual Expenditures) <br />Project Schedule <br />phase - = <br />_ Wrnposed <br />= Actual <br />— <br />t ew - == <br />Final Environmental Document <br />_� TER = <br />= -6� <br />(EN 8 <br />OCTA_ °'— <br />—_ <br />PJiase _ <br />U—M <br />- _f3_QURE) <br />RSTFr <br />= _Funding <br />Totalm <br />Engineering <br />$ - <br />$ - <br />$ - $ - <br />$ - <br />$ - <br />Right -of -Way <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Construction <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Total <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />Project Schedule <br />phase - = <br />_ Wrnposed <br />= Actual <br />Draft Environmental Document <br />Final Environmental Document <br />Begin Design Engineering <br />Plans, Specifications, and Cost Estimates complete <br />Start Right -of -Way Acquisition <br />Right-of-Way Certification <br />Ready to Advertise <br />Award Construction <br />Project Completion (open for use) <br />Page 1 <br />