My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22B - SPEC - HVAC REPAIR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
22B - SPEC - HVAC REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 3:30:16 PM
Creation date
3/10/2016 3:25:20 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
22B
Date
3/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Technology and Energy Audits Applies to Pollce Headquarters Facility Only <br />Proposer may be required to review designated HVAC systems, evaluating the current use of our HVAC <br />Systems and what may have been changed or been modified in our dally facility operation that impacts <br />the effectiveness of the system. Proposer may review applicable building control technologies, suggest <br />possible new strategies or technologies that could be implemented to enhance our current system, and <br />consider what changes, enhancements and /or upgrades should be made to facilitate our future plans. In <br />addition, recommendations should be made about adding and /or modifying applications, sensors, points <br />panels and /or software where needed to improve building operation and performance. Proposer may <br />Interface with the local utility provider to determine possible incentives and rebates. Once the review is <br />completed, a written report of the findings and recommendations may be requested. <br />HVAC EQUIPMENT LIST <br />POLICE DEPARTMENT HEADQUARTERS (Maintenance & Repairs for this facility) <br />60 Civic Center Plaza <br />Air handlers: 46 <br />Gravity Roof Vents: 15 <br />Small recirculating pumps: 16 <br />Chillers: 2 <br />York Model YTHIJ3E2CRG <br />Building Boilers: 2 <br />Bryan Model RV450- W- FDG -WXL 3,600,000 MGH (1995) <br />Water heater boilers: 4 <br />2 - Model 1250 N 600 ATP -PVI 1,000,000 BTU /HR <br />2 - Model 1500 N 1500 ATP -PVI 1,200,000 BTU /HR <br />IT Server Room - Air Conditioning Units <br />1 — Liebert - Model VEZ45A -AAM Ser: 307193 -001 <br />1 — Liebert — Model CDF30SLA Remote Condenser <br />Ser: 94009100 <br />2 — DataAire — Model DTWV -0532 A/C Units <br />911 Dispatch Center <br />1 — York Air Handler Model D2CE240E03646ECC <br />with two (2) compressors and heating <br />Exhaust fans: 52 <br />Large water pumps: 24 <br />Cooling towers: 2 <br />Marley Twin w /20HP Motor & gear reducer <br />Water booster system pumps: 3 <br />A/C units: 8 <br />Large Walk -in Freezers: 6 <br />3 - Model LAHA - 032E - TAD -100 (Evidence) <br />3 - Kolpak AE66280B (Jail Kitchen) <br />Large Refrigerators: 4 <br />1 - Model K55HIJZF (Evidence) <br />3 - Kolpak Cold Zone (Jail Kitchen) <br />NOTE: York Rotary Chiller YSCBCAS1 -CHA was decommissioned and does not require any attention. <br />Repairs as needed — for these facilities - Time & Materials Onlv <br />CITY HALL <br />20 Civic Center Plaza <br />Air Handler #11 — 8th Floor <br />Air Handler #10 — 7th Floor <br />Air Handler #09— 6th Floor <br />Air Handler #08 — 5th Floor <br />Air Handler 907 -- 4th Floor <br />Air Handler #06 — 3rd Floor <br />Air Handler #04 — 2nd Floor <br />Air Handler #01 — 1st Floor <br />Air Handler #02 -- 1st Floor Mezzanine <br />Air Handler #05 — Council Chambers <br />Air Handlers — Basement Data Rooms 1 & 2 <br />Chilled Water Pump #1 <br />Chilled Water Pump #2 <br />Cond #1 <br />Cond #2 <br />Fluid cooler for Liebert <br />Exhaust unit <br />Chiller - AVM Condenser <br />Restroom exhaust <br />Fluid cooler for Data Center <br />Exhaust <br />Air Compressor #1 <br />Air Compressor #2 <br />Hot Water Pump <br />Flash Tank <br />Roof Exhaust Units (3) <br />Facilities HVAC Service, Maintenance and Repairs 15 -114 <br />Page 17 <br />22B -23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.