My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MEMORY LANE SA RIVER PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
23A - PROJ - MEMORY LANE SA RIVER PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 8:17:09 AM
Creation date
3/10/2016 4:44:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 15 -2647 <br />MEMORY LANE - SANTA ANA RIVER PARK <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />PROM: LEHMAN CONSTRUCTION, INC. <br />REQUIREMENT, <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in aocordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedula: <br />BASE BID <br />Item <br />Description <br />Qty <br />Uuil <br />Unit Price <br />Amomlt <br />1 <br />Mobilization <br />I <br />LS <br />---- <br />$ 93,420.00 <br />2 <br />Demolition <br />— <br />1 <br />LS <br />____ <br />$ <br />4,463.00 <br />3 <br />(wading <br />614 <br />CY <br />$ <br />12.00 <br />$ <br />7,366.00 <br />4 <br />Drainage and Domes tic Water <br />1 <br />LS <br />$ 20,256.00 <br />5 <br />Dry Wells (2 total) <br />1 <br />LS <br />$ 55,650,00 <br />6 <br />Light Fixtures and Footings <br />1 <br />LS <br />$ <br />68,800.00 <br />7 <br />Electrical Service, Controls, <br />Trenching and Conduit <br />1 <br />LS <br />- - -- <br />$ <br />24, 893.00 <br />7a <br />Electrical Service Connection to <br />SCE Point of Connection, <br />300 <br />LF <br />- - -- <br />$18.00 <br />$ <br />5,400.00 <br />8 <br />Concrete Work <br />1 <br />L-S <br />20,580.00 <br />9 <br />Permeable Concrete Pavers <br />2,424 <br />SF <br />$ 6.00 <br />$ 19,392.00 <br />10 <br />Pilasters <br />1 <br />LS <br />- -__ <br />$ 21,468.00 <br />--4 <br />Wooden Bridge <br />3 <br />EA <br />$ 1,713..00 <br />$ 5,139.00 <br />11 <br />8' -0" Wooden Bridge <br />1 <br />EA <br />$ 2,952.00 <br />$ 2,962.00 <br />P -1 of P-17 <br />23A -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.