My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MEMORY LANE SA RIVER PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
23A - PROJ - MEMORY LANE SA RIVER PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 8:17:09 AM
Creation date
3/10/2016 4:44:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A, Pulido <br />MAYOR PRO TEM <br />Claudia C, Alvarez <br />COUNCILMEMBERS <br />David Berevides <br />Carlos Bustsmante <br />Mlahele Martlnez <br />Vincent F. Sarmlonto <br />Sal Tinajero <br />February 19, 2016 <br />ADDENDUM No. ONE <br />�i rg <br />c <br />CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY M -36 <br />P,Q. Box 1988 <br />Santa Ana, Callfornla 92702 <br />SUBJECT: PROJECT No. 15 -2647: Memory Lane Santa Ana River Park <br />INTERIM CITY MANAGER <br />Paul M. Walters <br />CITY ATTORNEY <br />9onla CarvRlho <br />CLERK OF THE COUNCIL, <br />Merle D, Hulzar <br />The following changes have been made to the plans and specifications of the subject project: <br />Plans <br />1, Replace sheets GR -1 (4 of 28), UT -1 (5 of 28), LC -1 (8 of 28), LI.1 (23 of 28) and LP -1 <br />(27 of 28) with the attached sheets GR -1 (4 of 28), UT -1 (5 of 28), LC -1 (8 of 28), LI -1 <br />(23 of 28) and LP -1 (27 of 28). <br />Specifications <br />1. Replace sheets P -1, P -2 and P -3 (of P -17) with the attached sheets P -1, P -2 and P -3 (of <br />P -1'7). <br />2. Page 21, Section 7 -8.6.2 Best Management Practices (BMPs): revise paragraph 1, to <br />read as follows: <br />"Contractor shall provide erosion and sediment control per plan included in the Conti-act <br />Documents. If Contract wants to implement an alternative plan, Contract shall prepare <br />erosion and sediment control plans immediately after the award of the contract, for <br />approval by the Engineer. The plan shall be prepared per the applicable guidelines <br />described in the California Storm Water Best Management Practices Handbook. The <br />Contractor shall submit the plans for review and shall make the necessary revisions to <br />the plans as directed by the Engineer. The plans shall be prepared by a licensed Civil <br />Engineer. The AGENCY may waive the requirement of licensed Civil Engineer if the <br />Contractor can satisfactorily prove to the Engineer that the person preparing the erosion <br />control plan is qualified in the field of erosion control. " <br />3. Page 61, Section 3.02.19.C,3 PLANTING OPERATIONS, Trees and Shrubs, Root <br />Control Barrier: add third paragraph as follows: <br />"For park locations, root control barrier shall be 18 -inch wide minimum by 0.06 -inch <br />thick high impact polystyrene sheeting, manufactured for root barrier purposes, <br />Sheeting shall have root deflector ribbing and pre - molded Joiner strips of the same <br />material, and shall be utilized wherever tree occurs within 6' -0" of hardscaped areas." <br />23A -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.