My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - MEMORY LANE SA RIVER PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
23A - PROJ - MEMORY LANE SA RIVER PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2016 8:17:09 AM
Creation date
3/10/2016 4:44:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
3/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
August 9, 2013 <br />ADDENDUM No. ONE <br />PROJECT No, 10.7557 <br />Page 3 <br />and Installation of all necessary electrical conduit end wiring for electrical system In <br />accordance with the plans, details and specifications. <br />R Appendix A, Definition of Bid Items, Page.5; Bid Item No. 19 - Planting: amend the <br />paragraph to read as follows; <br />"..,.,....and perform 60- calendar day maintenance In accordance with the plans, details, <br />specifications and City of Santa Ana Standards." <br />10. Appendix A, Definition of Bid Items, Page 5; Bid Item No. 20 - Irrigation: amend the <br />paragraph to read as follows: <br />....and perform 60- calendar day maintenance In accordance with the plans, details, <br />specifications and City of Santa Ana Standards," <br />11. Appendix A, Definition of Bid Items, Page 6, Additive Alternate Bid Item No, 4 - Picnic <br />Shelter: add the following sentences to the section: <br />"This item does shall include electrical service and lighting fixtures for picnic shelter." <br />12. Appendix A, Definition of Bid Items, Page 6, Additive Alternate Bid Item No. 5 - County <br />Improvements: revise section to read as follows: <br />"Payment for'Addltive Alternate 5" will be made on a Lump sum (L.S.) basis, as <br />specified in the Bidder's Proposal, but shall be based on related bid unit prices and shall <br />include all costs for furnishing all labor, profit, taxes, materials, tools, equipment, and <br />incidentals required, County Permit costs, remoblllzation as occurs, and performing all <br />work Involved and required to furnish and Install, irrigation, planting and rock cobble <br />Improvements that occur outside the city property and within County property in <br />accordance with the plans, details and specifications." <br />All other terms and conditions remain the same. <br />POR THE CITY gF- �AN ANA <br />William E. Galvez <br />City Engineer <br />Public Works Agency <br />23A -38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.