My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - STREETCAR DESIGN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
25F - AGMT - STREETCAR DESIGN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 4:48:33 PM
Creation date
3/10/2016 4:44:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
3/15/2016
Destruction Year
2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO, C -5 -3583 <br />1 "Design Consultant " means the firm(s) procured by the AUTHORITY to perform preliminary <br />2 and /or final design services to produce the Plans and Specifications. <br />3 "Effective Date" means the date this Agreement is executed by the Parties. <br />4 "Mitigation Monitoring and Reporting Program" means the program for the implementation of <br />5 the mitigation measures adopted for the Project as identified by the CITY in the Revised Environmental <br />6 Assessment (REA) /Final Environmental Impact Report (FEIR) approved by the CITY'S City Council <br />7 on January 20, 2015. <br />8 "00 Streetcar" is the operating streetcar vehicles and all streetcar infrastructure including the <br />9 track, the overhead contact system (wires, poles, conduits, and appurtenances), the traction power <br />10 system (substations, conduits, controllers, and appurtenances), streetcar signage, stations or stops <br />11 (lighting, shelters, and all stop features), utilities supporting the streetcar from point of service, and a <br />12 maintenance and storage facility (MSF). <br />13 "Operations and Maintenance Agreement" means the cooperative agreement between the <br />14 AUTHORITY and the CITY establishing the roles, responsibilities, and expectations with respect to <br />15 the operations and maintenance of the OC Streetcar. <br />16 "PE ROW" means the property owned by the AUTHORITY, previously the Pacific Electric <br />17 Railroad ROW, intended to be used for the OC Streetcar between Raitt Street and Harbor Boulevard. <br />18 "Plans and Specifications" means the Project plans, specifications, and special provisions <br />19 prepared by the Design Consultant and /or the AUTHORITY providing the information necessary to <br />20 construct the Project. <br />21 "Project Submittals" means all design drawings, product data, test data, specifications, design <br />22 submittals, schedules, cost estimates, erection drawings or similar documents which are produced by <br />23 or on behalf of the AUTHORITY during the design of the Project, and which relate to the Plans and <br />24 Specifications or otherwise affect the interests of the CITY under this Agreement. <br />25 <br />26 <br />C:\ Usersyfunk \AppData \LocaAMicrosoft\ Windows\ INetCachelContent .OutloolQBK3MRVOHVAG53563. 20160210 OCTA SA DesIgn <br />Agreement - Post Final Amendment .docx <br />Page 4 of 13 <br />25F -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.