My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH - MATER DEI EXPANSION AND PARKING STRUCTURE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
03/15/2016
>
75D - PH - MATER DEI EXPANSION AND PARKING STRUCTURE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2016 10:21:29 AM
Creation date
3/15/2016 10:14:34 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
3/15/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EIR No. 2013 -01 and Amend DA No. 1999 -01 <br />July 13, 2015 <br />Page 6 <br />The EIR, as required by CEQA, contains 1) an initial study; 2) a project description; 3) a description <br />of the environmental setting, potential environmental impacts, mitigation measures for any significant <br />effects, and consistency with plans and policies; and 4) names of preparers. The mitigation <br />measures included in this EIR are designed to reduce or eliminate the potentially significant <br />environmental impacts described herein. The scope of the EIR evaluates the proposed project's <br />effects on the following resource topics: aesthetics, air quality, biological resources, cultural <br />resources, geology and soils, greenhouse gas emissions, hazards and hazardous materials, <br />hydrology and water quality, land use and planning, noise, population and housing, public <br />services, recreation, transportation and traffic, and utilities and service systems. <br />The City prepared a draft EIR and published the Notice of Availability (NOA) in the Orange County <br />Register as well as posted the NOA at the Orange County Clerk's office on October 6, 2012. The <br />City circulated the draft EIR for a 45 -day public review between October 6, 2014 and November <br />19, 2014. The draft EIR was available for public review at the Santa Ana City Hall, the City of <br />Santa Ana Main Library, and on the City's website. <br />This EIR is intended to provide a forum to air and address comments pertaining to the analysis <br />contained in the draft EIR and to provide an opportunity for clarification, corrections, or minor <br />revisions to the EIR as needed. Comments were received during the public review period. Pursuant <br />to Section 15088 of the State CEQA Guidelines, the City, as the lead agency for the project, has <br />reviewed all comments received on the document. <br />As a result of the environmental analysis, only one significant impact was identified from the <br />construction of the proposed project, which involves significant impacts related to long -term <br />degradation of the visual character /quality of the site and its surroundings. For those impacts <br />identified as less than significant, mitigation measures have been provided to address potential <br />environmental impacts, with a list of these mitigation measures found within the attached <br />Mitigation Monitoring and Reporting Program. Mitigation measures have been outlined to address <br />potential impacts on aesthetics /light and glare, air quality and noise. <br />Strategic Plan Alignment <br />Approval of this item supports the City's efforts to meet Goal No. 3 Economic Development, <br />Objective No. 2 (create new opportunities for business /job growth and encourage private <br />development through new General Plan and Zoning Ordinance policies). <br />75D -8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.