My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-019 - California Environmental Quality Act
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2016
>
2016-019 - California Environmental Quality Act
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 10:41:28 AM
Creation date
3/22/2016 11:51:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2016-019
Date
3/15/2016
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mater Dei High School <br />(9) Parldng Structure and School Expansion Project <br />Environmental Impact Report <br />Based upon its review of the IIR, the Lead Agency finds that the EIR is an adequate assessment of <br />the potentially significant environmental impacts of the proposed project, represents the <br />independent judgment of the City, and sets forth an adequate range of alternatives to this project. <br />The Final EIR is composed of the following elements: <br />The Mater Dei High School Parking Structure and School Expansion Project Public Review <br />Draft Environmental Impact Report (October 2014); <br />Responses to Comments; and <br />Mitigation Motutoring and Reporting Program. <br />The remainder of this document is organized as follows: <br />1.2 Description of Project Proposed for Approval; <br />1.3 Effects Determined to be Less Than Significant in the Initial Study /Notice of <br />Preparation; <br />1.4 Effects Determined to be Less Than Significant in the EIR; <br />1.5 Effects Determined to be Mitigated to Less Than Significant Levels; <br />Lb Environmental Effects Which Remain Significant and Unavoidable After Mitigation and <br />Findings; and <br />1.7 Alternatives to the Proposed Project. <br />1.2 DESCRIPTION OF PROPOSED PROJECT <br />The proposed project involves the construction of a three -level parking structtu e cast of the school's <br />existing campus (east of the existing football and soccer fields) and a two -story classroom build ng <br />within the boundaries of die existing campus (west and south of classroom buildings 100 and 600). <br />No change to the school's existing operations would occur; however, maximun student enrollment <br />is proposed to be increased from 2,200 students to 2,500 students. The addition of the proposed <br />parking structure would increase the size of the campus from approximately 21 acres to 25 acres. <br />PARKING STRUCTURE <br />The project proposes to acquire an additional 4.0 acres of land to the cast of the existing school in <br />order to construct a new parking structure. This land is currently occupied by existing residential <br />uses. Implementation of the proposed project would require the demolition of these structures, site <br />grading, and construction of the new parking structure. The proposed parking structure would <br />provide 990 parking spaces in three levels. The parking structure would have a maximum height of <br />30 feet. No subterranean levels are proposed. The stricture would be open on three sides. <br />Statement of Pacts and Findings 2 June 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.