Laserfiche WebLink
(9) Mater Del High School <br />Parking Structure and School Expansion Project <br />Environmental Impact Report <br />2. The tee %t identzfied by the Draft.EI Gave been determined not to be ,sign #cant. <br />Facts in Support of Fin dings <br />The potential cumulative impacts from short -term construction noise have been mitigated or <br />substantially lessened to a level of less than significant by virtue of the mitigation measure identified <br />in the Draft EIR. <br />Mitigation Measurer <br />N -1 Prior to Grading Permit issuance, the Project Applicant shall demonstrate, to the <br />satisfaction of the City of Santa Ana Planning Division that the project complies <br />with the following: <br />Construction contracts specify that all construction equipment, fixed or mobile, <br />shall be equipped with properly operating and maintained mufflers and other <br />state required noise attenuation devices. <br />Property owners and occupants located within 500 feet of the project boundary <br />shall be sent a notice, at least 15 days prior to commencement of construction of <br />each phase, regarding the construction schedule of the proposed project. A sign, <br />legible at a distance of 50 feet shall also be posted at the project construction site. <br />All notices and signs shall be reviewed and approved by the City of Santa Ana <br />Planning Division, prior to mailing or posting and shall indicate the dates and <br />duration of construction activities, as well as provide a contact name and a <br />telephone number where residents can inquire about the construction process <br />and register complaints. <br />Prior to issuance of any Grading or Building Permit, the Contractor shall provide <br />evidence that a construction staff member will be designated as a Noise <br />Disturbance Coordinator and will be present on -site during construction <br />activities. The Noise Disturbance Coordinator shall be responsible for <br />responding to any local complaints about construction noise. When a complaint <br />is received, the Noise Disturbance Coordinator shall notify the City within 24- <br />hours of the compbunt and determine the cause of the noise complaint (e.g., <br />starting too early, bad muffler, etc.) and shall implement reasonable measures to <br />resolve the complaint, as deemed acceptable by the Public Works Executive <br />Director. All notices that are sent to residential units immediately surrounding <br />the construction site and all signs posted at the constriction site shall include the <br />contact name and the telephone nuunber for the Noise Disturbance Coordinator. <br />Prior to issuance of ,my Grading or Building Permit, the Project Applicant shall <br />demonstrate to the satisfaction of the City's Building Safety Manager that <br />construction noise reduction methods shall be used where feasible. These <br />reduction methods include shutting off idling equipment, installing temporary <br />acoustic barriers around stationary construction noise sources, maximizing the <br />Statement of Pacts and Findings 26 June 2015 <br />