My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-019 - California Environmental Quality Act
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2016
>
2016-019 - California Environmental Quality Act
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2016 10:41:28 AM
Creation date
3/22/2016 11:51:05 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2016-019
Date
3/15/2016
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(9) <br />Mater Del High School <br />Parldug Structure and School Expansion Project <br />Environmental Impact Report <br />Final EIR would not provide the project benefits, as summarized below, to the same extent as the <br />proposed project: <br />+ The City of Santa Ana finds that all feasible mitigation treasures have been imposed to <br />lessen project impacts to less than significant levels; and furthermore, that alternatives to the <br />project are infeasible because while they have similar or less environmental impacts, they do <br />not provide the benefits of the project, or are otherwise socially or economically infeasible <br />when compared to the project, as described in the Statement of Facts and Findings. <br />+ The project would provide an ou- campus parking structure to accommodate existing and <br />projected parlung demand under the Master Plati furAllaterDee High School. <br />• The project would provide a new parlung structure and two -story classroom building to <br />accommodate projected growth and increase maximum student enrollment from 2,200 <br />students to 2,500 students. <br />• The project would provide improvements that minim ze impacts of the proposed project on <br />the surrounding community both on -site (screening walls, landscaping improvements, <br />enhanced architectural treatments), and off-site (transportation improvements). <br />• The project would result in the improvement of an existing educational /institutional facility <br />with a long - standing history in Santa Ana, providing benefits to the surrounding community <br />and City. <br />Although significant impacts would remain, the City of Santa Ana would mitigate any significant <br />adverse impacts to aesthetics /light and glare to the maximum extent practicable. In its decision to <br />approve the project, the City has considered the project benefits to outweigh the environmental <br />impacts. <br />Statement of Facts and Findings 33 June 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.