Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 16-2656 <br />SANTA ANA STADIUM STRUCTURAL CONCRETE REPAIR <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Metro Builders & Engineers Group, Ltd. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the <br />proposed work, that they have examined the Contract Documents in its entirety and hereby <br />proposes to furnish all material and do all the work required to complete the said work in <br />accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set <br />forth in the following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilization (Not to Exceed 10% of Total <br />Contract) <br />1 <br />LS <br />$ LO99 D <br />/ <br />$ Z (� d a 0 <br />/ <br />2 <br />TemporarySupportt* <br />20 <br />EA <br />$(1o90 <br />$2.0/090 <br />3 <br />Parapet Wall Replacement <br />4 <br />EA <br />$ q Sou <br />1 <br />$ 1g,000 <br />4 <br />Degraded Beam Replacement (6" avg. <br />length) <br />4 <br />EA <br />$ <br />6J909 <br />$ <br />a <br />Z b� On <br />5 <br />Extensive Beam Replacement (4' avg. <br />length) <br />16 <br />EA <br />� 0 <br />$ <br />8� <br />_6 <br />/ <br />Concrete Spall Repair w/ Exposed Rebar <br />(3" avg, depth)* <br />2,400 <br />SF <br />$ // ��ss <br />b/ n <br />$ <br />I t b 009 <br />. <br />7 <br />Concrete Spelling (1" avg. depth)* <br />1,100 <br />SF <br />$ q ( 0V <br />"1 <br />$ LI P ) DID <br />7� <br />8 <br />Cracks Epoxy Injection* <br />360 <br />LF <br />$ 27 %-t <br />$ <br />9 <br />U -Shaped Galvanized Plate at Post <br />(Complete -in-place) <br />120 <br />EA <br />$pp <br />L), y$ <br />$ <br />a 91710 <br />10 <br />Joint Seal with Backer Rod* <br />11000 <br />LF <br />$ / O D <br />S <br />$ S� DOD <br />11 <br />Temporary Construction Signs <br />4 <br />EA <br />$ <br />$ L J D O D <br />BP -1 of 17 <br />